Les amis du CENA
Crenais,Jean-michel
Notes
- N90-097: C/R 4EME REUNION DU RASS USER S GROUP
- N90-253: C/R 5EME REUNION DU RUG
- N91-091: C/R DU RUG.6
- N91-580: ANNEXE CONVENTION THOMSON-SDC/CENA ETUDES ATN-V3
- R91-019: OBJECT CORRELATOR EVALUATION
- N92-543: EURATN SUBTASK 1.1 PROGRESS REPORT (MARCH 92)
- N92-588: EURATN SUBTASK 1.1.PROGRESS REPORT (MAY 92)
- N92-604: PROPOSAL FOR THE SATCOM GES ACCESS
- N92-608: EURATN DOCUMENTATION DIRECTORY
- N92-610: COMPTE-RENDU ISDG 5
- N92-612: PPR PHASE 1 EURATN REQUIREMENTS
- N92-646: FIRST SOFREAVIA SPR FOR EURATN SUBTASK 1.2
- N92-723: MINUTES OF PATN MEETING 30.11.92/01.12.92 IN ATHIS MONS
- N93-521: PPR PHASE 2 EURATN GENERAL SPECIFICATIONS
- N93-545: MINUTES OF MEETING FANSTIC 2 SUB-SUBTASK 2.1.2.
- N93-547: CCTP DU 3EME BC ETUDES RELATIVES AUX TELECOM AERONAUTIQUES
- N93-554: EURATN WORK DOC NETWORK DISPLAY DETAILED SPECIFICATIONS
- N93-556: FIRST SOFREAVIA SPR FOR EURATN SUBTASK 3.3
- N93-562: FANSTIC II TASK II MANAGEMENT DOCUMENT
- N93-635: EURATN DOCUMENTATIONN DIRECTORY PHASE 3
- N93-672: FANSTIC II-TASK 2 PROGRESS REPORT JULY 93
- N93-702: DETAILED SPECIFICATIONS OF THE MANAGER GRAPHICAL INTERFACE
- N93-710: PPR PHASE 3 EURATN SYSTEMS SPECIFICATIONNS
- N93-731: NTD IMPLEMENTATION ISSUES
- N93-777: CCTP 4EME BDC ETUDES RELATIVES AUX TELECOM AERONAUTIQUES
- N93-810: FANSTIC II TASK PROGRESS REPORT (PERIOD 17.5.93-10.12.93)
- N94-557: FAA/EUROCONTROL MOU ATN INTEROPERABILITY TESTS SPECIFICATIONS (1ST DRAFT 22.02.94)
- N94-564: ISDG-10 INFORMATION PAPER SYSTEMS MANAGEMENT IN EURATN
- N94-610: PRESENTATION OF THE CENA SIMULATED ATN DELAYS SOFTWARE
- N94-628: DEFINITION OF OPERATIONAL SUBSET FOR EURATN VALIDATION
- N94-640: EURATN STATUS REPORT MAY 94
- N94-676: PROGRESS REPORT NB 3 TASK 2 (13.11.93-13.5.94)
- N94-699: FANSTIC II SUB-SUBTASK 2.2.1. GROUND STATION CONFIGURATION
- N94-737: AR3 SUBTASK 2.2 REPORTING PERIODE : 17.5.94/15.8.94 FANSTIC
- N94-772: ATN MANUAL DEFECT REPORT ALLOCATION OF FIXED VALUES TO THE NSAP SELECTOR
- N94-798: EURATN PROJECT PHASE REPORT 5 SYSTEMS DEVELOPMENT (END) SYSTEMS INTERGRATION (INTERMEDIATE)
- N94-806: CCTP ETUDES,SIMULATIONS ET EXPE ATN
- N94-812: EURATN CPR 5
- N94-831: FANSTIC II-AR3-SUBTASK 2.2 PERIOD : 16/08/94-15/11/94
- N94-832: FANSTIC II-PROGRESS REPORT-TASK 2,PERIOD : 14/05/94-15/11/94
- N94-847: EURATN TPR6 SYSTEM DEVELOPMENT (END)
- N94-860: EURATN DOCUMENTATION DIRECTORY SYSTEMS DEVELOPMENT PHASE
- N94-861: EURATN CPR6
- N95-501: EURATN PROJECT SYNTHESIS REPORT
- NT95-546: DRAFT ATN SARPS & GUIDANCE MATERIAL DOCUMENT-VERSION 1.1 (CHANGES PAGES FROM VERSION 1.0)
- NT95-606: REPORT OF 1ST MEETING OF ATNP WG2 CISEC
- NT95-620: THE EURATN (TEXTE PRESENTE A LA CONFERENCE AATT ORGANISE EN JUIN 95 PAR LA CEC D6VII)
- NT95-621: LE PROJET EURATN (ARTICLE PRESENTE A L'ASECNA-DAKAR JUIN 95)
- NA95-631: CCTP POUR BON DE COMMANDE N.92.12.098/CENA PASSE AVEC LA SOCIETE MARBEN"SUPPORT AUX EXPERIMENTATIONS ATN"
- NA95-653: CCTP POUR UN BON DE COMMANDE SUR LE MARCHE N.92.12.098/CENA PASSE AVEC LA SOCIETE MARBEN "ETUDES,SIMULATIONS ET EXPERIMENTATION ATN"
- NA95-672: ACTIVITY REPORT LOUD 3-FANSTIC II SUBTASK 2.2-PERIOD : 15/02/95-15/05/95
- NA95-673: PROGRESS REPORT-FANSTIC II TASK 2-PERIOD : 15/11/94-15/05/95
Retour à la page principale
Pour toute demande d'aide, d'information ou d'accès, veuillez vous reporter au forum du site..