| Reference | Titre | Auteur |
| NL97-001 | AN IMPLEMENTATION OF A REACTIVE DISTRIBUTED AIR CONFLICT RESOLUTION SYSTEM ISADS97 | BOSC JEAN-FRANCOIS,DEAN GARFIELD |
| NL97-002 | OPTIMAL PLANNING OF DIGITAL CORDLESS TELECOMMUNICATION SYSTEMS | FRUEHWIRTH THOM,BRISSET PASCAL |
| NL97-003 | AIRSPACE CONGESTION SMOOTHING BY STOCHASTIC OPTIMIZATION EVOLUTIONARY PROGRAMMING 97 | DELAHAYE DANIEL,ODONI AMEDEO |
| NL97-004 | PREVISION STOCHASTIQUE DE TRAJECTOIRES : PROCEDURES PARAMETRIQUES ET NON-PARAMETRIQUES RAPPORT DE DEA IFP | BONTEMPS CHRISTIAN |
| NL97-005 | OPTIMISATION PAR HYBRIDATION D'UN CSP AVEC UN ALGORITHME GENETIQUE JFPLC'97 | BARNIER NICOLAS,BRISSET PASCAL |
| NL97-006 | OPTIMAL RESOLUTION OF EN ROUTE CONFLICTS SEMINAIRE EUROPE/USA,SACLAY,JUIN 1997 | DURAND NICOLAS,ALLIOT JEAN-MARC |
| NL97-007 | AN EXPERIMENTAL STUDY OF ATM CAPACITY SYMPOSIUM EUROPE/USA | ALLIOT JEAN-MARC,BOSC JEAN-FRANCOIS,DURAND NICOLAS,MAUGIS LIONEL |
| NL97-008 | AIRSPACE CONGESTION SMOOTHING BY STOCHASTIC OPTIMIZATION | DELAHAYE DANIEL |
| NL97-009 | OPTIMIZATION BY HYBRIDIZATION OF A GENETIC ALGORITHM WITH CSP TECHNIQUES ESSLLI 97 | BARNIER NICOLAS |
| NL97-010 | OPTIMISATION PAR HYBRIDATION D'UN ALGORITHME GENETIQUE AVEC LA RAPPORT DE DEA IFP | BARNIER NICOLAS |
| NL97-011 | TECHNIQUES D'EVITEMENT REACTIF ET SIMULATION DU TRAFIC AERIEN THESE DOCTORAT INFORMATIQUE DE L'INPT | BOSC JEAN-FRANCOIS |
| NL97-012 | CATS: A COMPLETE AIR TRAFFIC SIMULATOR 16TH DASC. | ALLIOT JEAN-MARC,BOSC JEAN-FRANCOIS,DURAND NICOLAS,MAUGIS LIONEL |
| NL97-013 | VALIDATION D'UN SYSTEME CRITIQUE PAR RETRO-CONCEPTION FORMELLE CONGRES GENIE LOGICIEL ET SES APPLICATIONS | GIANAZZA DAVID,GIRARD FRANCOISE,LEMOINE MICHEL,D MARRE,PREUX FRANCIS,WIPPLER JEAN-LUC |
| NT97-001 | COMPTE-RENDU D'ACTIVITES MODE-S/AGLAE A FIN DECEMBRE 1996 | FAVENNEC BRUNO |
| NT97-002 | EVALUATION METEO/MODE-S CR N.3/96 | FAVENNEC BRUNO |
| NT97-003 | JOURNEE D'ETUDE SUR LES PROJETS ET TECHNIQUES DE DETECTION,VISUALISATION ET PREVISION DES PHENOMENES ORAGEUX DANS LE CONTEXTE DE LA NAVIGATION AERIENNE | DELRIEU ALAIN |
| NA97-005 | CCTP MARCHE SOFREAVIA : ASSISTANCE EN ERGONOMIE | SALVI REYNALD |
| NA97-006 | ANNEXE TECHNIQUE MARCHE CST : ASSISTANCE HEGIAS | SALVI REYNALD |
| NA97-007 | RAPPORT DE PRESENTATION DES FICHES DES PROJETS DE MARCHES INFORMATIQUESPOUR 1997 | SABATIER MICHEL |
| NT97-008 | HEGIAS : COMPTE-RENDU D'AVANCEMENT MENSUEL : PERIODE DECEMBRE 1996 | THERET JEAN-LOUIS |
| NT97-009 | COMPTE-RENDU REUNION CALLIOPE DU 06/01/97(MATIN) | LAFAGE REMI |
| NT97-010 | DESCRIPTION DE LA MAQUETTE APHRODITE | LAFAGE REMI,MANDON THIERRY |
| NT97-011 | COMPTE-RENDU REUNION PAD DU 08/01/97-POURSUITE RADAR DANS PAD | DEBERGHES CHRISTIAN |
| NT97-012 | COMPTE-RENDU REUNION PAD/ADP DU 10/01/97 | DEBERGHES CHRISTIAN |
| NT97-013 | DESCRIPTION DE L'INTERFACE LE_LISP DU WIDGET-RADAR V2.1 | MERTZ CHRISTOPHE,RUIZ DOMINIQUE |
| NT97-014 | DAP TRIALS AT ADP : PROJECT AND ORGANIZATION AND INITIAL PLANNING | FAVENNEC BRUNO |
| NT97-015 | COMPTE-RENDU REUNION AVANCEMENT EXPE PAD/ADP | FAVENNEC BRUNO |
| NR97-016 | IOCP STEP 1B-EXPERIMENTAL PROTOCOL-GENERAL DEFINITION-VERSION 0.0 | DE-BELER NATHALIE |
| NR97-017 | PROTOCOLE EXPERIMENTAL DE L'IOCP STEP 1B-PROTOCOLE DETAILLE-DRAFT | DE-BELER NATHALIE |
| NT97-018 | COMPTE-RENDU REUNION DU PCC/38 A EUROCONTROL BRETIGNY DU 14 AU 16/01/97 | SAGNIER YVES |
| NT97-019 | EXPE MAGIC/TNP-QUESTIONNAIRE DEDIE AUX PILOTES ET CONTROLEURS | CHICOT XAVIER |
| NT97-020 | COMPTE-RENDU REUNION CALLIOPE DU 06/01/97 (APRES-MIDI) | LOURME REGIS |
| NT97-021 | GUIDE D'UTILISATION DES MOYENS INFORMATIQUES DU CENA | VICENTE ISABELLE |
| NT97-022 | EXPERIMENTATION MAGIC/TNP-FONCTION D'ARCHIVAGE | CHICOT XAVIER |
| NT97-023 | COMPTE-RENDU REUNION ERATO DU 21/10/96 SCTA/STNA | EYDALEINE GENEVIEVE |
| NA97-024 | PDD AMENDEMENT PROPOSAL IN THE FRAME OF THE FRENCH IMPLICATION IN PETAL II-ADP/PADS TRIALS | FAVENNEC BRUNO |
| NT97-025 | CONCEPTS IHM EXISTANTS EN VUE DE L'EXPERIMENTATION ESCAPADE (EX PAD A ADP) | DEBERGHES CHRISTIAN |
| NT97-026 | COMPTE-RENDU REUNION SUR LA CONNEXION DU TGDLP A RSTNA | THIVENT ERIC |
| NT97-027 | COMPTE-RENDU ESCAPADE (PAD/ADP) DU 29/01/97-THEMES ET METHODES D'EVALUATION | DEBERGHES CHRISTIAN |
| NT97-028 | MAGIC/TNP-MANUEL UTILISATEUR DU PILOTE | CHICOT XAVIER |
| NA97-029 | RAPPORT DE PRESENTATION DU PROJET DE MARCHE AVEC AVIACONSULT | KERLIRZIN PHILIPPE |
| NT97-030 | MINUTES OF THE 3RD MEETING ON THE FRENCH IMPLICATION IN PETAL II | SAGNIER YVES |
| NT97-031 | COMPTE-RENDU STNA4/CENA SUR LES ACTIVITES MODE-S | FAVENNEC BRUNO |
| NT97-032 | COMPTE-RENDU REUNION ESCAPADE DU 07/02/97 | FAVENNEC BRUNO |
| NA97-033 | DESCRIPTIF TECHNIQUE EXPERTISE PILOTE EXPERIMENTATION CALLIOPE | CHRUPEK NATHALIE |
| NT97-034 | USE OF A MODE-S INFRASTRUCTURE IN PETAL II-PRELIMINARY FEASABILITY STUDY | FAVENNEC BRUNO |
| NA97-035 | COMPTE-RENDU DE REUNION DE LA DIVISION TCC DU 27.01.97 | CARRE PHILIPPE |
| NT97-036 | ALGORITHMES DE CALCUL DE REPRISE DE ROUTE POUR L'IOCP 1B | DARDENNE NICOLAS |
| NT97-037 | GESPRO-GESTION DU PROJET CALLIOPE | LAFAGE REMI |
| NT97-038 | BEOP EXPRESSION DU BESOIN OPERATIONNNEL DU PROJET CALLIOPE | LAFAGE REMI |
| NA97-039 | CCTP POUR LE MARCHE 95.024-ASSISTANCE POUR LES SIMULATIONS RVSM ET TOSCA | KERLIRZIN PHILIPPE |
| NA97-040 | CCTP MARCHE SOFREAVIA-EXPERTISE OPERATIONNELLE | SALVI REYNALD |
| NT97-041 | COMPTE-RENDU DE LA REUNION INTERNE PD/3 DU 11.02.97 A TOULOUSE | CAQUET MICHEL |
| NT97-042 | ETUDE DE L'INTEGRATION DE FONCTIONS D'ORCA DANS SHAMAN | ALLARD ERIC |
| NT97-043 | ETUDE DE REBOUCLAGES ENTRE L'AFM ET L'ATC DREAMS | MANCHON SERGE,CHRUPEK NATHALIE,VILLE GEOFFROY |
| NT97-044 | MODELISATION DE LA PRECISION D'UNE PREVISION DE TRAJECTOIRES D'AVION | FAVIA BLANDINE |
| NT97-045 | COMPTE-RENDU DE LA REUNION CALLIOPE DU 25.02.97 | LAFAGE REMI |
| NA97-046 | CCTP ASSISTANCE CALLIOPE ET MAGIC MARCHE 96.12.025 | CHRUPEK NATHALIE |
| NT97-047 | DOCUMENT DE TRAVAIL SUR LE SOUS ENSEMBLE LOGICIEL NEGOCIATION MANAGE | CARRE PHILIPPE |
| NT97-048 | EXPERIMENTATIONS MAGIC/TNP RESULTATS DE LA CAMPAGNE MENEE AUPRES DE PILOTES ET CONTROLEURS | CHICOT XAVIER |
| NT97-049 | EXPERIMENTATIONS MAGIC/TNP THEMES OPERATIONNELS ET ECHANTILLONS DE TRAFIC | CHICOT XAVIER |
| NA97-050 | COMPTE-RENDU D'AVANCEMENT TCC/CR2A DES MOIS DE DECEMBRE 96 ET JANVIER 97 | CARRE PHILIPPE |
| NT97-051 | DEMANDE D'EVOLUTIONS IPAS POUR INTEGRATION DES DONNEES MASS | NOIRAUD JEAN-CLAUDE |
| NT97-052 | HEGIAS COMPTE-RENDU D'AVANCEMENT PERIODE JANVIER/FEVRIER 97 | THERET JEAN-LOUIS |
| NA97-053 | DESCRIPTIF TECHNIQUE POUR DES TRAVAUX D'ETUDES SUR LA FONCTION DE PREVISION DE TRAJECTOIRES | LECLAIRE CHRISTIAN,CHRUPEK NATHALIE |
| NT97-054 | COMPTE-RENDU REUNION ESCAPADE DU 28/02/97 | DEBERGHES CHRISTIAN |
| NA97-055 | ANNEXE TECHNIQUE POUR LES ETUDES SUR LA COOPERATION SOL-BORD "EVOLUTIONS MAGIC ET EFMS" | CHRUPEK NATHALIE |
| NT97-056 | COMPTE-RENDU DE LA REUNION GENERALE PLEINIERE DU SICASP A MONTREAL DU 10 AU 19 FEVRIER 1997 | SAGNIER YVES |
| NA97-057 | ANNEXE TECHNIQUE POUR LES ETUDES SUR LA PREVISION DE TRAJECTOIRES ET L'UTILISATION DU DATA-LINK | CHRUPEK NATHALIE,LAFAGE REMI |
| NA97-059 | ANNEXE TECHNIQUE AU MARCHE 96.023 EVOLUTIONS DU LOGICIEL ORCA | KERLIRZIN PHILIPPE |
| NA97-060 | HEGIAS / PD3-COMPTE-RENDU DE MISSION | SABATIER MICHEL |
| NT97-061 | COMPTE-RENDU REUNION D'INFORMATION SUR PLATE-FORME IOCP 1B-OURASIE | PAVET DIDIER |
| NT97-062 | EVALUATION BANC EXPERIMENTAL CENA POUR PD3 : PROTOCOLE | PAVET DIDIER |
| NT97-063 | IMPACT DES PRECONISATIONS PD3 SUR L'ENVIRONNEMENT DE SIMULATION | VIGIER JEAN-CLAUDE |
| NA97-064 | COMPTE-RENDU DE LA REUNION DE DIRECTION DU 10/03/97 | SABATIER MICHEL |
| NA97-065 | CCTP PRESTATIONS D'ASSISTANCE MAITISE D'OEUVRE PD3 | SAGNIER YVES |
| NA97-066 | CCTP PROJETS EUROPEENS DE LA DIVISION ATT | PAGE ERWAN |
| NT97-067 | ETUDES DES TEMPS DE ROULAGE ENTRE TAT ET AIR INTER A ORLY | COURBOULAY MATHIAS |
| NT97-068 | COMPTE-RENDU DE LA REUNION PD3 DU 14/03/97-ATHIS-MONS | CAQUET MICHEL |
| NT97-069 | COMPTE-RENDU DE LA VISITE DU PMB AU CENA-TOULOUSE LE 11/03/97 | CAQUET MICHEL |
| NT97-070 | ETUDES ET EVALUATIONS DE STRATEGIES D'ALLOCATION ET DE METHODES DE REGULATION A L'AIDE DE SHAMAN | MANCHON SERGE,PLUSQUELLEC CHRISTINE |
| NT97-071 | CALIBRAGE DU MODULE D'ALLOCATION DE CRENEAUX DE SHAMAN UTILISANT LA PROGRAMMATION PAR CONTRAINTES | PLUSQUELLEC CHRISTINE |
| NT97-072 | ETUDES DES PROBLEMES STRUCTURELS DE L'ESPACE AERIEN FRANCAIS | PLUSQUELLEC CHRISTINE,KERLIRZIN PHILIPPE,MANCHON SERGE |
| NT97-073 | COMPTE-RENDU REUNION ESCAPADE (TACHE 2-1-1) DU 20/03/97 | FAVENNEC BRUNO |
| NT97-074 | COMPTE-RENDU REUNION ESCAPADE (TACHE 1-2) DU 25/03/97 | FAVENNEC BRUNO |
| NT97-075 | TDP : FONCTIONNEMENT DE SERVEURS SOLUTIONS | KELLER PASCAL |
| NT97-076 | TRANSFERT EN PLANIFICATION | VILLE GEOFFROY |
| NA97-077 | RAPPORT DE PRESENTATION-AVENANT AU MARCHE 96.12.026 | MOREAU PATRICK |
| NT97-078 | ESCAPADE : GENERAL PRESENTATION | DEBERGHES CHRISTIAN |
| NT97-079 | MODELE D'INCERTITUDE SUR LA POSITION DES VOLS DANS TDP | VILLE GEOFFROY |
| NT97-080 | SCENARIO D'INTEGRATION D'UN AVION EXPERIMENTAL DANS LA DEMONSTRATION PHARE PD3 DU CENA | CAQUET MICHEL |
| NT97-081 | DEPARTURE MANAGER : SPECIFICATIONS IHM | DUBOUCHET E |
| N97-082 | PHARE : DEPARTURE MANAGER V1 TEST DOC | DUBOUCHET E |
| NT97-083 | ARAMIS TASTE 1100 RESULTS | FAVIER PIERRE |
| NT97-084 | ARAMIS REQUIREMENTS FOR 4D PLANNING | FAVIER PIERRE |
| NT97-085 | DEPARTURE MANAGER V1 APPROACH SERVER USER'S GUIDE | MAVOIAN GERARD,CHAUVIGNE ISABELLE |
| NT97-086 | DEPARTURE MANAGER V1 : CONFIGURATION FILE | COUSIN XAVIER |
| NT97-087 | DEPARTURE MANAGER V1 GENERAL DESIGN | MAVOIAN GERARD |
| NT97-088 | DEPARTURE MANAGER V1 TECHNICAL HMI USER'S GUIDE | COUSIN XAVIER |
| NT97-089 | DEPARTURE MANAGER V1 INSTALLATION NOTES | MAVOIAN GERARD |
| NT97-089 | DEPARTURE MANAGER V1 INSTALLATION NOTES | MAVOIAN GERARD |
| NT97-090 | HUMAN CENTERED APPROACH PHASE 2 :EXPRESSION DE BESOINS | CAZARD BEATRICE,PAGE ERWAN,MAVOIAN GERARD |
| NT97-091 | EVALUATION DU BANC EXPERIMENTAL MASS/DAARWIN/HEGIAS RESULTATS DES LOTS | THERET JEAN-LOUIS |
| NT97-092 | COMPTE RENDU REUNION DIVISION TCC DU 10/03/97 | LOURME REGIS |
| NA97-093 | COMPTE RENDU REUNION DIRECTION DU 03/04/97 | MARIE CLAUDE |
| N97-094 | ROLE DES DIFFERENTES POSITIONS SUR LA REGULATION DES DEPARTS A CDG (MISE NE PERSPECTIVE AVEC DEPARTURE MANAGER) | KAHN JULIEN |
| NT97-095 | COMPTE RENDU REUNION AVEC CONTROLEURS PD2 | CAQUET MICHEL |
| NT97-096 | DICTIONNAIRE DE DONNEES POUR MOZART | COUSIN XAVIER |
| NT97-097 | PHARE : DEPARTURE MANAGER URD | COUSIN XAVIER |
| NT97-098 | MISE EN PLACE DE LA PROCEDURE CGS-IMPACT SRU L'ALLONGEMENT DES TRAJECTOIRES ET LA CAPACITE DE CONTROLE | AMAURY PHILIPPE |
| NT97-099 | CENA OBJECTIVES IN PHARE PD3 DEMONSTRTION-VERSION 4 | CAQUET MICHEL |
| NT97-100 | PROTOCOLE D'EVALUATION DE FAST SUR L'APPROCHE DE ROISSY CHARLES DE GAULLE | KAHN JULIEN |
| NT97-101 | ETUDES DES DELAIS RESULTANT DES VARIATIONS SUR LES HEURES D'ARRIVEES PROGRAMMEES GIMCA | ALLARD ERIC |
| NT97-102 | PROPOSITION D'ETUDE DES STRATEGIES D'ATTENTE EN CAS DE BROUILLARD A ORLY ET CDG | KERLIRZIN PHILIPPE |
| NT97-103 | IMAGINE-BETSI :LE PROTOCOLE EXPERIMENTAL | MERTZ CHRISTOPHE |
| NT97-104 | COMPTE-RENDU DE LA CONFERENCE CHI 97 | MERTZ CHRISTOPHE |
| NT97-105 | MODULE D'ALLOCATION CRENEAUX DE SHAMAN | MANCHON SERGE,PLUSQUELLEC CHRISTINE |
| NT97-106 | PD3 HMI SPECIFICATIONS FOR TMA/DEPARTURE PREVISION | GARRON JOEL |
| NT97-107 | INFLUENCE DE C2 SUR TE | DELOCHE ERIC |
| NT97-108 | IMAGINE-BETSI : LE MANUEL UTILISATEUR | MERTZ CHRISTOPHE |
| NT97-109 | IMAGINE-BETSI-UTILISATION ECRAN TACTILE-SAISIE DES INSTRUCTIONS SUR UNE POSITION DE CONTROLE-AVANTAGES ET INCONVENIENTS | MERTZ CHRISTOPHE |
| NA97-110 | PLAN A 5 ANS-1998/2002 | MONJARET GERARD |
| NT97-111 | TEMPS DE ROULAGE A ROISSY-FEVRIER 1997 | PUIG V |
| NA97-112 | CCTP-ASSISTANCE AU PROJET HEGIAS /PD3 (SOFREAVIA-AVIA CONSULT-CONTRAT PHARE) | SALVI REYNALD |
| NT97-113 | COMPTE-RENDU DE LA REUNION INTERNE PD/3 DU 07/05/97 | MARTIN JEAN-LOUIS |
| NT97-114 | C/R DE LA REUNION CALLIOPE GE DU 03/07/97 | LAFAGE REMI |
| NT97-115 | COMPTE-RENDU DE LA REUNION INTERNE PD3 DU 9 JUILLET 1997-VISIOCONFERENCE | CAQUET MICHEL |
| NT97-116 | CR DE REUNION ESCAPADE DU 8/7/97 APRES-MIDI | DEBERGHES CHRISTIAN |
| NT97-117 | INFLUENCE DE L'ACTIVATION DE LA ZONE C2 SUR LE SECTEUR TE\ | DELOCHE ERIC,KERLIRZIN PHILIPPE,MANCHON SERGE |
| NT97-118 | HEGIAS : COMPTE-RENDU D'AVANCEMENT MENSUEL POUR LA PERIODE MARS/AVRIL 1997 | THERET JEAN-LOUIS |
| NT97-119 | COMPTE-RENDU DE LA REUNION CALLIOPE DU 07/04/97 | LAFAGE REMI |
| NA97-120 | ANNEXE TECHNIQUE POUR UNE ASSISTANCE SUR LE PROJET PD/3 | SAGNIER YVES |
| NA97-121 | COMPTE-RENDU REUNION DE DIRECTION DU 06/05/97 | MONJARET GERARD |
| NR97-122 | GLOBAL AND ANALYTICAL APPROACHES TO VARIABILITY FOR THE DESIGN OF COMPLEX SYSTEMS : THE CASE OF AIR TRAFFIC CONTROL | PIERRET OLIVIER |
| NA97-123 | ANNEXE TECHNIQUE POUR LE MARCHE 96.024-PROJET GOETHE-PLATE-FORME EXPERIMENTALE SHAMAN | MANCHON SERGE,KERLIRZIN PHILIPPE |
| NA97-124 | CCTP BON DE COMMANDE PD/3-SPECIFICATION IHM | PAVET DIDIER |
| NA97-125 | ANNEXE TECHNIQUE MARCHE CR2A-ASSISTANCE HEGIAS (PD/3) | SALVI REYNALD |
| NA97-126 | ANNEXE TECHNIQUE MARCHE STERIA-ASSISTANCE HEGIAS (PD/3) | SALVI REYNALD |
| NT97-127 | L'ETAT DU NEGOTIATION MANAGER (NM) DE PHARE (EN ANGLAIS) | SAGNIER YVES,VELTEN JEAN-RAYMOND |
| NT97-128 | C/R 40EME REUNION DU PHARE COORDINATION COMMITTEE (PCC/40) A LANGEN 21-22 MAI 1997 | SAGNIER YVES |
| NA97-129 | NOTE FOR PMB,TELECONFERENCE OF MAY 30ST,1997 | PRINTEMPS ALAIN |
| NR97-130 | FAUT-IL TUER LA SOURIS? UNE COMPARAISON DES CHARGES COGNITIVES INDUITES PAR 6 PROCEDURES DE SAISIES (PROPOSE A IHM97) | MERTZ CHRISTOPHE |
| NR97-131 | IMAGINE-DIGISTRIPS : PROPOSITION DE SPECIFICATIONS POUR MANIPULER DES STRIPS AVEC LES DOIGTS SUR UN ECRAN TACTILE | MERTZ CHRISTOPHE,VINOT JEAN-LUC |
| NA97-132 | CCTP ASSISTANCE ANALYSE RESULTATS IOCP 1B PD/3 (SOFREAVIA-BERTIN-CONTRAT PHARE) | SALVI REYNALD |
| NT97-133 | COMPTE-RENDU REUNION PD3 /SID | CAQUET MICHEL |
| NR97-134 | HCI,NATURAL SCIENCE AND DESIGN: A FRAMEWORK FOR TRIANGULATION ACROSS DISCIPLINE | MACKAY WENDY,FAYARD LAURE |
| NR97-135 | RADICALEMENT NOUVEAU ET NEANMOINS FAMILIER : LES STRIPS PAPIERS REVUS PAR LA REALITE AUGMENTEE | MACKAY WENDY,FAYARD LAURE |
| NT97-136 | IMAGINE: SPECIFICATION D'UN BUS LOGICIEL | MERTZ CHRISTOPHE,LEPIED FREDERIC |
| N97-137 | ANNEXE TECHNIQUE DANS LE CADRE DU MARCHE 96.12.25 : ASSISTANCE AU PROJET IMAGINE | MERTZ CHRISTOPHE |
| N97-138 | PROPOSITION DE DOCUMENT : MASS/PD3 DATA FILES DESCRIPTION | MASS TEAM |
| N97-139 | COMPTE-RENDU DE LA REUNION DE LA DIVISION TCC DU 26 MAI 1997 | GUILBOT LAFAGE |
| N97-140 | CCTP ASSISTANCE EN ERGONOMIE POUR PD3 (CONTRAT PHARE) | SALVI REYNALD |
| N97-141 | RAPPORT DE PRESENTATION-COMMANDE UGAP D'UN SERVEUR SUN E3000 ET 2 STATIONS SUN SPARC 5 | MELENNEC RONAN |
| N97-142 | CR DE LA REUNION PD3 DU 3 JUIN 97 | CAQUET MICHEL |
| N97-143 | COMPTE-RENDU DU FORUM DE DIRECTION DU 9 JUIN 1997 | SALVI REYNALD |
| N97-144 | RAPPORT DE PRESENTATION D'UN MARCHE D'ETUDE EN ERGONOMIE | TROILLARD ELISABETH,SABATIER MICHEL |
| N97-145 | BON DE COMMANDE PROJET VIZIR | CHUPEAU FREDERIC |
| N97-146 | C/R DE LA VISIOCONFERENCE STNACENA DU 10/6/97 SUR LE DATA FLASH MODE S | SAGNIER YVES |
| N97-147 | ETAT D'AVANCEMENT N 3 DES TRAVAUX ENTREPRIS PAR LE CENA DANS LE CADRE DE LA CONVERGENCE COURAGE/SHAMAN | CROUZIER LAURENT |
| N97-148 | COMPTE-RENDU DE LA REUNION CALLIOPE DU 05 MAI 1997 AVEC AIR FRANCE EUROPE | GUILBOT LAFAGE |
| N97-149 | COMPTE-RENDU DE LA REUNION CALLIOPE DU 06 MAI 1997 AVEC CORSAIR | GUILBOT LAFAGE |
| N97-150 | COMPTE-RENDU DE LA REUNION CALLIOPE DU 29 MAI 1997 AVEC FLANDRE AIR | GUILBOT LAFAGE |
| N97-151 | COMPTE-RENDU DE LA REUNION CALLIOPE DU 10 JUIN 1997 AU CRNA/NORD | GUILBOT LAFAGE |
| N97-152 | HEGIAS : COMPTE-RENDU D'AVANCEMENT MENSUEL POUR LA PERIODE DE MAI 1997 | THERET JEAN-LOUIS |
| N97-153 | COMPTE-RENDU WGA 10 AMCP (MONTREAL DU 28/01/97 AU 07/02/97) | DELRIEU ALAIN |
| N97-154 | UTILISATION D'ELECTRA AU CENA | SABATIER MICHEL |
| N97-155 | PROPOSITION D'ACTIVITES MODE S/TCC 2EME SEMESTRE 1997 | FAVENNEC BRUNO |
| N97-156 | ANNEXE TECHNIQUE DANS LE CADRE DU MARCHE N 96.12.025 | VILLE GEOFFROY |
| NT97-157 | COMPTE RENDU ESCAPADE DU 30/05/97(AVANCEMENT CENA-STNA/4 N.2) TACHE 1-2 : GESTION DE PROJET. | FAVENNEC BRUNO |
| N97-158 | DESCRIPTIF TECHNIQUE POUR DES TRAVAUX D'ETUDES SUR LA FONCTION DE PREVISION DE TRAJECTOIRE | CHRUPEK NATHALIE,LECLAIRE CHRISTIAN |
| N97-159 | TESTS DE PERFORMANCES SUR MASS 3.2 | NOIRAUD JEAN-CLAUDE |
| N97-160 | PD3 /IHM ICS : COMPTE-RENDU AVANCEMENT MENSUEL PERIODE JUIN 97 | THERET JEAN-LOUIS |
| N97-161 | D'UNE UTILISATION DE CVS VERSION 1.1 | NOIRAUD JEAN-CLAUDE |
| N97-162 | PD3 HUMAN CENTERED APPROACH/IOCP EXPERIMENT RESULTS | CHABROL CAROLINE,COULLON ISABELLE |
| N97-163 | COMPTE RENDU DE LA REUNION CALLIOPE DU 16 JUIN 1997 AVEC EUROCONTROL | GUILBOT LAFAGE |
| N97-164 | HMI SPEFICICATIONS ELEMENTS FOR PD3 DEPARTURE POSITION | GARRON JOEL |
| N97-165 | COMPTE-RENDU DE LA REUNION CALLIOPE DU 25/06/97 | LAFAGE REMI |
| N97-166 | NOTE RELATIVE A LA SITUATION FINANCIERE DU CENA ET SES CONSEQUENCES SUR LE SERVICE | PRINTEMPS ALAIN |
| N97-167 | LES TELECOMS DANS LE MONDE DU CONTROLE AERIEN | PRINTEMPS ALAIN |
| N97-168 | RAPPORT DE PRESENTATION D'UN PROJET DE MARCHE : ASSISTANCE MAITRISE D'OUVRAGE PD/3 | SAGNIER YVES |
| N97-169 | C/R DE LA REUNION DE DIRECTION RESTREINTE DU 8 JUILLET 97 | SAGNIER YVES |
| N97-170 | C/R DE LA VISIOCONFERENCE CALLIOPE ENTRE CENA ET STNA LE 30 JUIN 97 | SAGNIER YVES |
| N97-171 | ESCAPADE : ORGANISATION OPERATIONNELLE | DEBERGHES CHRISTIAN |
| N97-172 | ESCAPADE : SCENARIO ET ECHANTILLON DE TRAFIC | DEBERGHES CHRISTIAN |
| N97-173 | CCTP : ASSISTANCE EN ERGONOMIE POUR PD3 (CONTRAT PHARE BERTIN-SOFREAVIA). | SALVI REYNALD |
| N97-174 | C/R D'AVANCEMENT ESCAPADE N.3 DU 8 JUILLET 1997 | FAVENNEC BRUNO |
| N97-175 | CORRESPONDANCE ENTRE LES APIS CMS V2 DU TP DU NATS ET SES FONCTIONS INTERNES | SAGNIER YVES |
| N97-176 | C/R DE LA REUNION "CONTROLEURS" CENA-SCTA DU 23/7/07 A/M | SAGNIER YVES,CHOURAQUI ROBERT |
| N97-177 | COMPTE RENDU DE LA REUNION DU 21 JUILLET 1997/ OBJET : DETERMINER LES THEMES D'EVALUATION/QUESTIONS EXPERIMENTALES,LIES A LA POSITION DEPART DE PD3 | DE-BELER NATHALIE |
| N97-178 | ENSEIGNEMENT DES EXPERIMENTATIONS IOCP 1B POUR PD3 | DE-BELER NATHALIE,CHABROL CAROLINE |
| N97-179 | LATENT ORGANISATIONAL RELIABILITY | SALEMBIER PASCAL,ZOUINAR MOUSTAPHA |
| N97-180 | PROPOSAL FOR A FRENCH IMPLICATION IN FITAMS | FAVENNEC BRUNO |
| N97-181 | CALLIOPE : ANALYSE DE L'EXISTANT | LOURME REGIS |
| N97-182 | C/R DU POINT ESCAPADE CENA/TCC DU 23/7/97 | FAVENNEC BRUNO |
| N97-183 | C/R DU POINT ESCAPADE TCC/EVA DU 24/7/97 | FAVENNEC BRUNO |
| N97-184 | PD3 IHM ICS : COMPTE-RENDU D'AVANCEMENT MENSUEL POUR LA PERIODE JUILLET 1997.(NOTE TECHNIQUE). | THERET JEAN-LOUIS |
| N97-185 | C/R DU PCC/41 A BRUXELLES LES 30 ET 31 JUILLET 97 | SAGNIER YVES,MARTIN JEAN-LOUIS |
| N97-186 | C/R DE LA VISIOCONFERENCE DU 5/7/97 SUR L'INTEGRATION DU MODE S DANS PROATN | SAGNIER YVES |
| N97-187 | COGNITION(S) SITUEE,DISTRIBUEE,SOCIALEMENT PARTAGEE | SALEMBIER PASCAL |
| N97-188 | ESCAPADE: PROJECT ORGANISATION AND PLANNING DOCUMENT | FAVENNEC BRUNO |
| N97-189 | ARCHITECTURE DU SIMULATEUR POUR ESCAPADE | MANDON THIERRY |
| N97-190 | ESCAPADE SIMULATOR : USER'S GUIDE | MANDON THIERRY |
| N97-191 | ESCAPADE : SPECIFICATION DES OUTILS D'ENREGISTREMENT ET DE REJEU | SALEMBIER PASCAL |
| N97-192 | RECHERCHE SUR L'OPTIMISATION DES CYCLES ACTIVITE-REPOS ET LE MAINTIEN DE LA VIGILANCE DES CONTROLEURS DU TRAFIC AERIEN CIVIL-PHASE III. | LAA |
| N97-193 | ETUDE DE L'IMPACT D'UNE PROGRAMMATION DE 36/60 POUR LES ARRIVEES A ORLY | ALLARD ERIC,KERLIRZIN PHILIPPE,MANCHON SERGE |
| N97-194 | LES ITINERAIRES DANS LES DONNEES C.A | GUILBOT LAFAGE |
| N97-195 | DOSSIER SPECIFICATION LOGICIEL DU SYSTEME D'ANALYSE AUTOMATIQUE CALLIOPE | GUILBOT LAFAGE |
| N97-196 | CCTP POUR PRESTATIONS POUR LES PROJETS ADS-EUROPE,EOLIA ET MODELISATIONS. | MONJARET GERARD |
| N97-197 | DOCUMENT CALLIOPE-ACTIONS AU 01/09/97 | LAFAGE REMI |
| N97-198 | COMPTE RENDU DE LA REUNION DE DIVISION TCC | DUPAS JEAN-JACQUES |
| N97-199 | PD3/IHM ICS : COMPTE-RENDU D'AVANCEMENT MENSUEL POUR LA PERIODE AOUT 1997.(NOTE TECHNIQUE). | THERET JEAN-LOUIS |
| NT97-200 | ANNEXE TECHNIQUE POUR LES ETUDES SUR LA COOPERATION SOL-BORD | CHRUPEK NATHALIE |
| NT97-201 | PROPOSAL FOR THE INCLUSION OF CALLIOPE TRIALS INTO PETAL II | LOURME REGIS |
| NR97-202 | IMAGINE-BETSI : RESULTATS DES EXPERIEMNTATIONS D'UN ECRAN TACTILE PUOR LA SAISIE D'INSTRUCTIONS | MERTZ CHRISTOPHE |
| N97-203 | COMPTE_RENDU DE LA REUNION ESCAPADE CENA TCC-EVA DU 27/8/97 | FAVENNEC BRUNO |
| N97-204 | COMPTE-RENDU DE LA REUNION ESCAPADE CENA/TCC-STNA/4FV DU 27/08/97 | FAVENNEC BRUNO |
| N97-205 | COMPTE RENDU DE LA REUNION PD3 DU 5 SEPTEMBRE 97 (VISIO-CONFERENCE) | CAQUET MICHEL |
| N97-206 | 3EME REUNION DU COMITE DIRECTEUR EOLIA DU 10 SEPTEMBRE 1997 | SAGNIER YVES |
| N97-207 | EXPERIMENTATION CALLIOPE SPECIFICATION POUR LE SYSTEME D'ANALYSE ERGONOMIQUE | MONTAGNE EMMANUEL |
| N97-208 | PROTOCOLE GENERAL D'EVALUATION ERGONOMIQUE POUR L'EXPERIMENTATION CALLIOPE (ETAPE 2.1) | MONTAGNE EMMANUEL |
| N97-209 | CR VISITE NASA ET AEROPORT DE DALLAS FORTWATH DU 9 AU 12 SEPTEBMRE 1997 | PRINTEMPS ALAIN |
| N97-210 | COOPERATION AND SHARED CONTEXT-ARTICLE PRESENTE AU DOCTORAL COLLOQUIUM DE ECSCW 97 LANCASTER-GB | ZOUINAR MOUSTAPHA |
| NT97-211 | COMPTE-RENDU DU 16 SEPTEMBRE 97 POUR L'INTEGRATION DE CALLIOPE DANS PETAL II | LOURME REGIS |
| N97-211 | C/R REUNION DU 16 SEPTEMBRE 97 POUR L'INTEGRATION DE CALLIOPE DANS PETAL II | LOURME REGIS |
| NA97-212 | RAPPORT DE PRESENTATION-MARCHE D'EXTENSION DE LA CHAINE DE LA SIMULATION RADIO | MOREAU PATRICK |
| N97-212 | RAPPORT DE PRESENTATION-MARCHE D'EXTENSION DE LA CHAINE DE SIMULATION RADIO | MOREAU PATRICK |
| NA97-213 | CCTP EXTENSION CHAINE DE SIMULATION RADIO | MOREAU PATRICK |
| N97-213 | CTTP EXTENSION CHAINE DE SIMULATION RADIO | MOREAU PATRICK |
| NR97-214 | SHOULD WE KILL THE MOUSE ? COMPARING MENTAL LOAD INDUCED BY SIX INPUT DIALOGS (A PROPOSE A CHI'98) | MERTZ CHRISTOPHE |
| NR97-215 | REINVENTING THE FAMILIAR : EXPLORING AN AUGMENTED REALITY DESIGN SPACE FOR AIR TRAFFIC CONTROL (PROPOSE A CHI'98) | MACKAY WENDY,FAYARD LAURE,FROBERT LAURENT,MEDINI LIONEL |
| NA97-216 | ANNEXE TECHNIQUE POUR LES ETUDES SUR LA PREVISION DE TRAJECTOIRE-MARCHE CR2A | LOURME REGIS |
| NA97-217 | ANNEXE TECHNIQUE POUR LES ETUDES SUR LA COOPERATION SOL-BORD-MARCHE CR2A | LOURME REGIS |
| NA97-218 | ANNEXE TECHNIQUE POUR LES ETUDES SUR LA PREVISION DE TRAJECTOIRE ET L'UTILISATION DU DATALINK-MARCHE CR2A | LOURME REGIS |
| NT97-219 | PD3 : CHARGE DE TRAFIC DANS LES ECHANTILLONS | VIGIER JEAN-CLAUDE |
| NA97-220 | COMPTE-RENDU FORUM DU CENA TENU A ATHIS MONS LE 15/09/97 | DELRIEU ALAIN |
| NA97-221 | ANNEXE TECHNIQUE POUR LE BON DE COMMANDE SUR LE MARCHE 96.12.025 | PAGE ERWAN |
| NT97-222 | COMPTE RENDU REUNION ESCAPADE : METEOROLOGIE | DEBERGHES CHRISTIAN |
| NA97-223 | NOTE DE SERVICE A L'ECHELON ADMINISTRATIF DU CENA TOULOUSE | MARIE CLAUDE |
| NA97-224 | ANNEXE TECHNIQUE POUR LE MARCHE 96.12.024 PROJET GOETHE : PLATE-FORME EXPE SHAMAN | MANCHON SERGE |
| NT97-225 | PD3/IHM ICS : COMPTE-RENDU D'AVANCEMENT MENSUEL POUR LA PERIODE SEPTEMBRE 97 | THERET JEAN-LOUIS |
| NT97-226 | COMPTE-RENDU DE LA REUNION CITRAQ,TP DU 29/09/97 | DUPAS JEAN-JACQUES |
| NT97-227 | COMPTE-RENDU DE LA REUNION PD3 DU 06/10/97 | CAQUET MICHEL |
| NT97-228 | COMPTE-RENDU DE LA VISIOCONFERENCE SUR LE POINT 6 DU PLAN FAA/EUROCONTROL (19/09/97) | SAGNIER YVES |
| NT97-229 | COMPTE-RENDU REUNION DU 42EME PHARE COORDINATION COMMITEE PCC A HURN 24-25 SEPTEMBRE 97) | SAGNIER YVES,MARTIN JEAN-LOUIS |
| NT97-230 | COMPTE-RENDU DE LA VISIOCONFERENCE DU 06/10/97 SUR LA COOPERATION AVEF AVEC AIRBUS POUR LA MISE EN OEUVRE DU DATA LINK | SAGNIER YVES |
| NT97-231 | COMPTE-RENDU AVANCEMENT ESCAPADE FIN JUILLET 1997 | FAVENNEC BRUNO |
| NT97-232 | COMPTE-RENDU REUNION D'AVANCEMENT ESCAPADE DU 12/09/97 | FAVENNEC BRUNO |
| NT97-233 | ISSUES RELATIVE TO PATS AND CMS AS CONCERNED CENA | SAGNIER YVES,MARTIN JEAN-LOUIS |
| NT97-234 | COMPTE-RENDU DE LA REUNION ESCAPADE STNA/ADP/CENA DU 25/09/97 | DEBERGHES CHRISTIAN |
| NA97-235 | ANNEXE TECHNIQUE DANS LE CADRE DU MARCHE 96.12.025 CR2A "ASSISTANCE DU PROJET PD3/HEGIAS" | PAVET DIDIER |
| NA97-236 | ANNEXE TECHNIQUE DANS LE CADRE DU MARCHE 96.12.025 CR2A "ASSISTANCE AU PROJET IMAGINE" | PAVET DIDIER |
| NA97-237 | ANNEXE TECHNIQUE DANS LE CADRE DU MARCHE 96.12.023 CAP SESA "ASSISTANCE DU PROJET PD3/HEGIAS" | PAVET DIDIER |
| NT97-238 | SOME PRINCIPLES FOR MANAGING FUTURE EUROCONTROL RESEARCH AND DEVELOPMENT | PRINTEMPS ALAIN,ESPERON DOMINIQUE |
| NA97-239 | ANNEXE TECHNIQUE DANS LE CADRE DU MARCHE 96.12.022 STERIA "ASSISTANCE AU PROJET PD3/HEGIAS" | PAVET DIDIER |
| NA97-240 | ANNEXE TECHNIQUE BON DE COMMANDE PROJET VIZIR | CHUPEAU FREDERIC |
| NA97-241 | ANNEXE TECHNIQUE BON DE COMMANDE PROJET CONTREPOINT | CHUPEAU FREDERIC |
| NT97-242 | ETUDE "REGION PARISIENNE" GROUPE DE TRAVAIL "LIMITES DU DISPOSITIF CA ACTUEL" RESULTATS DES SIMULATIONS POUR LE TRAFFIC PREVU EN 2001 | KERLIRZIN PHILIPPE,MANCHON SERGE,CROUZIER LAURENT |
| NA97-243 | ANNEXE TECHNIQUE AU MARCHE 96.12.023 CAP SESA-EVOLUTIONS DU LOGICIEL ORCA | KERLIRZIN PHILIPPE |
| NT97-244 | USE OF MODE S DATALINK IN PETAL II-COMPLEMENTARY FEASABILITY STUDY : DLIC & CAP SERVICES COMPLIANCE STATEMENT | FAVENNEC BRUNO |
| NT97-245 | COMPTE-RENDU REUNION TCC/PD3 SUR LA PREVISION DE TRAJECTOIRE | LECLAIRE CHRISTIAN |
| NT97-246 | DESCRIPTIF TECHNIQUE DES TACHES A REALISER DANS LE CADRE DU PROJET ESCAPADE | DEBERGHES CHRISTIAN |
| NT97-247 | CALLIOPE PROPOSAL FOR PETAL II INCLUSION REPLY TO EUR-O66 | LOURME REGIS |
| NT97-248 | COMPTE-RENDU DU PORTAGE DES COMPOSANTS SUR COMPILATEUR GNAT V3.09 DATE DE SEPTEMBRE 97 | ING V |
| NT97-249_1 | SCRIPT DU FILM ESCAPADE | DEBERGHES CHRISTIAN |
| NT97-250 | CENA PD3 AIRBORNE PROGRAMME : MINUTES OF CEV MEETING 20/10/97 | CAQUET MICHEL |
| NT97-251 | COMPTE-RENDU DE LA REUNION CALLIOPE GT DU 10/10/97 | THERET JEAN-LOUIS |
| NT97-252 | PD3/IHM ICS : COMPTE-RENDU D'AVANCEMENT MENSUEL POUR LA PERIODE OCTOBRE 1997 | THERET JEAN-LOUIS |
| NT97-253 | COMPTE-RENDU DE LA REUNION DE DIVISION TCC DU 28/10/97 | LECLAIRE CHRISTIAN |
| NT97-254 | COMPTE-RENDU DE LA REUNION PD3 DU 5 NOVEMBRE 97 | CAQUET MICHEL |
| NT97-255 | DOSSIER DE CONCEPTION LOGICIEL DU SYSTEME D'ANALYSE AUTOMATIQUE-CALLIOPE_PLN-ETAPE 2.1 | GUILBOT LAFAGE |
| NT97-256 | CALLIOPE-ACTIONS | LAFAGE REMI |
| NT97-257 | COMPTE-RENDU DE LA REUNION AVENUE AVEC LA COMMISSION | PRINTEMPS ALAIN |
| NT97-258 | COMPTE-RENDU DE LA REUNION DU GROUPE DE PILOTAGE DU PROJET CALLIOPE DU 27/10/97 | LOURME REGIS |
| NT97-259 | PD3/ICS : VERSION DE CONTROLE DE L'IHM DEPART | THERET JEAN-LOUIS |
| NT97-260 | CCTP PRESTATIONS D'ASSISTANCES TECHNIQUES A LA DEMONSTRATION PHARE PD3 | SAGNIER YVES |
| NT97-261 | ESCAPADE : MANUEL UTILISATEUR DES PILOTS ECHOS-RADAR | DEBERGHES CHRISTIAN |
| NT97-262 | COMPTE-RENDU DE LA REUNION DATA-LINK AIRBUS (DALIDA) DU 12/11/97 | SAGNIER YVES |
| NT97-263 | COMPTE-RENDU DE LA VISITE A NASA/AMES ET A L'AEROPORT DE DALLAS | DAGUZON ISABELLE |
| NT97-264 | PREMIER SEMINAIRE US/EUROPE-EVALUATING THE COST OF ASM/ATFM MEASURES | MANCHON SERGE,KERLIRZIN PHILIPPE,PLUSQUELLEC CHRISTINE |
| NT97-265 | 16TH DASC EVALUATING THE COST OF ASM/ATFM MEASURES | MANCHON SERGE,KERLIRZIN PHILIPPE,PLUSQUELLEC CHRISTINE |
| NA97-266 | ABUS DE RESSOURCES RESEAUX | PRINTEMPS ALAIN |
| NT97-267 | COMPTE-RENDU DE LA REUNION MINI-EXPERIMENTATION GRIGRI-GRIOT DU 22/11/97 | MERTZ CHRISTOPHE |
| NA97-268 | BILAN D'ACTIVITES DE E. MONTAGNE AU TITRE DE LA PREMIERE ANNEE DE LA CONVENTION 96/C0021 | MONTAGNE EMMANUEL |
| NT97-270 | COMPTE RENDU DES PRE-EXPES SUR LE MSP | CHABRE BERNARD |
| NT97-271 | REMARQUES DE LA DIVISION TCC SUR LE DOCUMENT "TRAJECTORY PREDICTION FOR EATCHIP-CONCEPT AND PRINCIPLES" | LECLAIRE CHRISTIAN |
| NT97-272 | COMPTE-RENDU DE LA REUNION "NAVETTE" DE L'AFFAIRE DATALINK AIRBUS DU 7/11/1997 | CHRUPEK NATHALIE |
| NT97-276 | PRESENTATION DE L'ACTION PLAN 6 DE LA COOPERATION FAA-EUROCONTROL AU 26/11/97 | SAGNIER YVES |
| NT97-277 | AMANDA : ASSISTANCE AU CHOIX D'UN CAP OU D'UN NIVEAU DANS LE BUT DE RESOUDRE UN CONFLIT-ETUDE DES ALGORITHMES | CAZAUBIEILH HUBERT,CHUPEAU FREDERIC |
| NT97-279 | CALLIOPE : COMPTE-RENDU GROUPE DE PILOTAGE 3-REUNION DU 25/11/97 | LOURME REGIS |
| NT97-281 | DESCRIPTION DE LA PREPARATION ET DE LA MISE EN OEUVRE TECHNIQUE DES SIMULATIONS CALLIOPE | LAFAGE REMI |
| NT97-286 | TECHNIQUES DE DETERMINATION DE LA CAPACITE DES SECTEURS DE CONTROLE DE L'ESPACE AERIEN : STATISTIQUES ET SIMULATIONS. APPLICATION A LA MISE EN OEUVRE DU RVSM | MAUGIS LIONEL,GOTTELAND JEAN-BAPTISTE |
| NT97-288 | ASSESSMENT OF RVSM PROCEDURES WITH THE OPAS SYSTEM. NOTE PRESENTEE AU GROUPE OACI RGCSP (REVIEW OF THE GENERAL OF SEPARATION PANEL) 13 OCTOBRE 1997. BRUXELLES. | MAUGIS LIONEL,MALESCOT DIDIER |
| NT97-289 | C/R DE LA REUNION ESCAPADE DU 24/10/1997 | FAVENNEC BRUNO |
| NT97-290 | C/R D'AVANCEMENT ESCAPADE N.6 (REUNION DU 3/11/1997 | FAVENNEC BRUNO |
| NT97-291 | COMPTE RENDU DE LA REUNION ESCAPADE DU 27/11/1997 | FAVENNEC BRUNO |
| NT97-292 | C/R DU POINT ESCAPADE TCC/EVA DU 5/12/1997 | FAVENNEC BRUNO |
| NT97-293 | CAHIER DE TESTS PREALABLES A LA PREMIERE EXPERIMENTATION N.1 ESCAPADE | FAVENNEC BRUNO |
| NT97-294 | C/R DES TESTS PREALABLES A LA PREMIERE EXPERIMENTATION N.1 ESCAPADE | FAVENNEC BRUNO |
| NT97-295 | CHECK-LIST POUR LA PRE-EXPERIMENTATION N.1 | FAVENNEC BRUNO |
| NT97-297 | EXPLOITATION DES PLANS DE VOL RECUEILLIS DANS L'EXPERIMENTATION CALLIOPE | MONTAGNE EMMANUEL |
| NT97-298 | NOTE DE PRESENTATION DES SIMULATIONS EDYNAV | MONTAGNE EMMANUEL |
| NR97-299 | DIVA: EXPLORATORY DATA ANALYSIS WITH MULTIMEDIA STREAMS. | MACKAY WENDY,BEAUDOUIN-LAFON MICHEL |
| NT97-300 | COMPTE-RENDU DE LA VISTE PMB LE 12/12/97 A TOULOUSE | CAQUET MICHEL |
| NT97-301 | PD/3 IHM ICS : COMPTE-RENDU D'AVANCEMENT MENSUEL POUR LA PERIODE DE DECEMBRE 1997 | THERET JEAN-LOUIS |
| NT97-302 | COMPTE-RENDU DE LA REUNION DE REMUE-MENINGES DU 5 DECEMBRE 97 | CHRUPEK NATHALIE,SAGNIER YVES |
| NT97-303 | COMPTE-RENDU D'AVANCEMENT DU PROJET DALIDA AU 17/12/98 | SAGNIER YVES |
| NT97-304 | COMPTE-RENDU DE LA REUNION D'AVANCEMENT DALIDA DU 18/12/98 | SAGNIER YVES |
| NT97-305 | NOTE DE SYNTHESE DU PROJET DALIDA POUR DNA/ADT | SAGNIER YVES |
| NT97-306 | COMPTE-RENDU PHARE COORDINATION COMMITEE 43 | SAGNIER YVES |
| NT97-307 | COMPTE-RENDU DE LA REUNION AMANDA DU 20 NOVEMBRE 97 | SAGNIER YVES |
| NT97-308 | SID (S) STAR (S) DANS PD3 | VIGIER JEAN-CLAUDE |
| NR97-309 | COMPUTER SCIENCE APPROACHES TO COOPERATION | ASHTIANI HALEH |
| NT97-502 | CR REUNION DE DEFINITION DE DRUIDE V2 | NOVALES LUC |
| NT97-503 | UTILISATION ET GESTION DU PROJET ODYSSEE | STAUB NORBERT |
| NT97-504 | GROUPE DE REFLEXION SUR LA SECURITE | FIGAROL SYLVIE,PEYTAVIN ALAIN |
| NT97-505 | CR REUNION DE COORDINATION AAC/ESV | TAHMASSEBI SOPHIE |
| NT97-506 | CR REUNION GROUPE UTILISATEUR DAARWIN | ESTIENNE MICHEL |
| NT97-507 | CAMELIA RDV1 : CR REUNION DU 14.01.97 SUR LE SUIVI DES DEVELOPPEMENTS SOL | MARCHE STEPHANE |
| NA97-508 | ASSISTANCE AUX ETUDES ET DEVELOPPEMENTS DE LA DIVISION SAS "ADAPTATION DU BANC DE TEST OSCAR" | CASAUX FRANCIS |
| NA97-509 | BUDGET FONCTIONNEMENT INFORMATIQUE 1997 CENA TOULOUSE | KRINER BRUNO |
| NT97-510 | CR REUNION RESEAUX LOCAUX DU CESNAC DU 20.12.96 | METGE SYLVAIN |
| NR97-511 | SIMULTANEOUS STABILIZATION OF LINEAR AND NONLINEAR SYSTEMS,BY MEANS OF NONLINEAR STATE FEEDBACK | HO-MOCK-QAI BERTINA |
| NT97-512 | ODYSSEE COMME MOYEN DE TEST DE GDS | TROILLARD ELISABETH |
| NT97-513 | MPPA-MISE A JOUR PETRIC | CUYEU MICHEL |
| NT97-514 | BILAN CEDRE 1 | FERNANDEZ OLIVIER |
| NT97-515 | NOTE SDF POUR LE GROUPE DE PILOTAGE PHIDIAS DU 28.01.97 | PEYTAVIN ALAIN |
| NT97-516 | ANALYSE DE L'EVENEMENT TCAS ALK557 DU 22 MAI 1996 AU CRNA NORD | HASQUENOPH BERNARD |
| NT97-517 | ANALYSE DE L'EVENEMENT TCAS IT-AG DU 21.07.96 AU CRNA NORD | HASQUENOPH BERNARD |
| NT97-518 | JEU DE FICHES EVENEMENTS RITA NO 2 | HASQUENOPH BERNARD |
| NT97-519 | CAMELIA RDV1 : CR DE LA REUNION DU 27.01.97 SUR LE SUIVI DES DEVELOPPEMENTS SOL | MARCHE STEPHANE |
| NT97-520 | TRANSFORMATION PC VERS ODS FRANCE-NOTE DE TRAVAIL GROUPE PILOTAGE PHIDIAS | ROBERT PATRICE |
| NT97-521 | REFLEXIONS SUR LES EVOLUTIONS POSSIBLES DE RITA | VALLAURI ERIC |
| NT97-522 | PLAN DE BATAILLE POUR CESAR | VALLAURI ERIC |
| NT97-523 | CR REUNION GROUPE DE TRAVAIL B DE L'ADSP DU 13 AU 24.01.97 A ATLANTA | GROUT JEAN-FRANCOIS |
| NR97-524 | CHERNOFF-TYPE BOUND FOR FINITE MARKOW CHAINS | LEZAUD PASCAL |
| NR97-525 | CHANGE 7 EVALUATION UNRESOLVED AN INDUCED COLLISIONS DUE TO THE CURRENT MISE DISTANCE FILTER IMPLEMENTATION : THE PARALLEL APPROACH EXAMPLE | ARINO THIERRY |
| NT97-526 | FRENCH METHODOLOGY FOR ASSESSING THAT A MRDPS CAN SUPPORT A GIVEN SEPARATION MINIMA | TACNET FRANCOISE |
| NT97-527 | CR REUNION SUR L'INTEGRATION DU HIPS | BONGERS P |
| NA97-528 | CR REUNION DE DIVISION DU 28.01.97 | HASQUENOPH BERNARD |
| NT97-529 | ANALYSE DE L'EVENEMENT TCAS AFR271 DU 4.12.96 A CDG | HASQUENOPH BERNARD |
| NA97-530 | NOTE DE PRESENTATION DE LA CONVENTION NEB/CENA/97.CO003 | TAHMASSEBI SOPHIE |
| NT97-532 | MODELISATION DE LA FAMILLE A330/A340 DANS PERFO | PIANETTI CHRISTELLE |
| NT97-533 | PLAN DE SECOURS CRNA : CR REUNION AVEC LES EXPERTS OPERATIONNELS DU 29.01.97 | MORTEVEILLE THIERRY |
| NR97-534 | TBDS FOR THE PERFORMANCE ORIENTED SARPS | ARINO THIERRY |
| NT97-535 | TESTS D'INTEGRATION DES COMPOSANTS TP ET FPM DANS DAARWIN POUR CAMELIA | BRO FREDERIC |
| NT97-536 | PHARE PD3 COOPERATIVE TOOLS USER REQUIREMENT DOCUMENT | CAZARD BEATRICE |
| NT97-537 | CR REUNION DU 31.01.97 SDF ERATO | GAUDIERE GERVAIS |
| NT97-538 | RAPPORT SDF PROJET CAMELIA | TOMCZAK FLORENCE |
| NT97-539 | MATRICE DE CORRESPONDANCE ENTRE LES EVENEMENTS DE BASE PHIDIAS ET LES CORRESPONDANTS STNA | METGE SYLVAIN |
| NT97-540 | MPPA / PORTAGE DES OUTILS MPPA SOUS SUN/SOLARIS | CUYEU MICHEL |
| NT97-541 | PLAN DE SECOURS COMPLEMENTS AU RAPPORT DE PRE ETUDE | MORTEVEILLE THIERRY |
| NT97-542 | ANALYSE DE L'EVENEMENT TCAS BAW 75 DU 27.06.96 AU CRNA NORD | HASQUENOPH BERNARD |
| NT97-543 | ANALYSE DE L'EVENEMENT TCAS DLH 5298 DU 15.06.96 AU CRNA/SE | HASQUENOPH BERNARD |
| NT97-544 | CR FORUM DE DIRECTION DU 04.02.97 A TOULOUSE | COLIN-DE-VERDIERE DOMINIQUE |
| NT97-545 | SYSTEMES CLIENT/SERVEUR | BORREL MARIE |
| NT97-546 | ELEMENTS DIDACTIQUES A PROPOS D'INTERNET | MARCHETTI ANNIE |
| NT97-547 | NOTE DE PRESENTATION DES EXPERIMENTATIONS PRELIMINAIRES A PD3 | CAZARD BEATRICE |
| NA97-548 | CCTP ASSISTANCE POUR LE PROJET ADS EUROPE | GROUT JEAN-FRANCOIS |
| NT97-549 | CR REUNION STNA/8 DU 10.02.97 | RASCLE DIDIER |
| NT97-550 | SUJET DE STAGE "MASTERE NAVIGABILITE" EXIGENCES SUR LE DATA LINK POUR AMELIORER LA SECURITE ET L'EFFICACITE DES COMMUNICATIONS CONTROLEURS/PILOTES | TAHMASSEBI SOPHIE,GROUT JEAN-FRANCOIS,PEYTAVIN ALAIN |
| NA97-551 | CCTP POUR BDC SUR LE MARCHE 95.12.024 SUR PLATEFORME ATN-MAI A NOVEMBRE 1997 | KIRCHER THOMAS |
| NA97-552 | CCTP POUR BDC SUR LE MARCHE 95.12.024 ASSISTANCE SUR PLATEFORME ATN-DECEMBRE 97 A MAI 98 | KIRCHER THOMAS |
| NT97-553 | BILAN INTERMEDIAIRE DU G S ERATO | LEROUX MARCEL |
| NT97-554 | CAMELIA-RDV1 : CR REUNION DU 21.02.97 SUR LE SUIVI DES DEVELOPPEMENTS SOL | MARCHE STEPHANE |
| NA97-555 | CCTP POUR BDC SUR MARCHE 95.12.024 ASSISTANCE A LA MAITRISE D'OUVRAGE POUR PROJET PATN | KIRCHER THOMAS |
| NT97-556 | IDRP LARGE SCALE SIMULATIONS : SUMMARY OF RESULTS | KIRCHER THOMAS,BUI NGA |
| NT97-557 | ANALYSE PRELIMINAIRE DE RISQUES D'ERATO-VERSION 3 PROVISOIRE | GAUDIERE GERVAIS |
| NT97-558 | ANNEXE TECHNIQUE POUR L'ETUDE DE SURETE DE FONCTIONNEMENT A REALISER SUR LE SYSTEME ARTAS | GAUDIERE GERVAIS |
| NR97-559 | LARGE DEVIATIONS FOR PARTIAL SUM PROCESSES OVER FINITE INTERVALS | BANEGE LIONEL |
| NT97-560 | SIMULATEUR ODYSSEE-VERSION 4 | STAUB NORBERT |
| NT97-561 | OPERATIONAL USE OF ASAS | CASAUX FRANCIS,VALLAURI ERIC |
| NR97-562 | CHANGE 7 EVALUATION-A PROPOSAL TO REDUCE UNDESIRABLE SECONDARY RAS AND TO MAINTAIN THE SAME PERFORMANCE LEVEL IN TERMS OF VERTICAL DEVIATION | ARINO THIERRY |
| NR97-563 | CONTRIBUTION DE LA DIVISION SAS AU RAPPORT D'ACTIVITE 95-96 DU CENA | CASAUX FRANCIS |
| NA97-564 | CR 6EME REUNION PLENIERE DU GROUPE D'EXPERTS SICASP-MONTREAL,10-19 FEVRIER 1997 | ARINO THIERRY |
| NA97-565 | REUNION DIVISION SAS DU 04 MARS 1997 | TAILLANDIER C |
| NT97-566 | ANALYSE DE L'EVENEMENT AFR061 DU 19.10.96 A CDG | AVENEAU CHRISTIAN |
| NT97-567 | CR 5EME REUNION DU COMITE DE PILOTAGE PLAN DE SECOURS CRNA DU 15.02.97 | MORTEVEILLE THIERRY |
| NT97-568 | SYNTHESE ANALYSE SDF DU PROJET ARTEMIS | TOMCZAK FLORENCE |
| NT97-569 | ANALYSE DE L'EVENEMENT TCAS TWA840 DU 09.07.96 AU CRNA/SE | HASQUENOPH BERNARD |
| NT97-570 | ANALYSE DE L'EVENEMENT TCAS AFRO81 DU 16.08.96 AU CRNA/N + CDG | HASQUENOPH BERNARD |
| NT97-571 | PRECISION DES PLOTS A CODE INVALIDE | ROUX SERGE |
| NT97-572 | ASPECTS PRATIQUES DE L'EXPERIMENTATION ERGONOMIQUE A PRENDRE EN COMPTE POUR L'ELABORATION DU PROTOCOLE D'EXPERIMENTATION DU DIL POUR CAMELIA | POMIAN JEAN-LOUIS |
| NT97-573 | METHODES,TECHNIQUES ET CRITERES DE VALIDATION ET D'EVALUATION DES PROJETS DE CONCEPTION DES IHM | POMIAN JEAN-LOUIS,COURTEIX SYLVIE |
| NT97-574 | PROTOCOLE D'EXPERIMENTATION DE CAMELIA | POMIAN JEAN-LOUIS,COURTEIX SYLVIE |
| NT97-575 | ANALYSE DES STOCKS DU PROJET ARTEMIS | TOMCZAK FLORENCE |
| NT97-576 | CR REUNION DU 5 MARS 1997 RELATIVE A LA SDF ERATO | GAUDIERE GERVAIS |
| NT97-577 | SYSTEMES CLIENT/SERVEUR : DES PROBLEMES AUX SOLUTIONS | METGE SYLVAIN |
| NA97-578 | BILAN DES ACTIVITES CENA 1996 | LEMAIRE MARIE-CHRISTINE |
| NT97-579 | ESTIMATING PASSING FREQUENCIES WITH FLIGHT PLAN DATA | MEHADHEBI KARIM |
| NT97-580 | STATISTICAL DETERMINATION OF THE HEIGHT KEEPING QUALITY CONTROL | MEHADHEBI KARIM |
| NT97-581 | ESTIMATION OF THE MEAN NUMBER OF OVERLAPPING IN THE REAL CASE | MEHADHEBI KARIM |
| NT97-582 | CR DES VISITES SUR LA SUPERVISION | TROILLARD ELISABETH |
| NT97-583 | INTEGRATION DES APPLICATIONS DE COMMUNICATION DE CAMELIA DANS DAARWIN | MARCHE STEPHANE |
| NT97-584 | CAMELIA RDV1 : PLAN D'INTEGRATION | MARCHE STEPHANE |
| NR97-586 | EFFET DE CONTEXTE SUR LA PRECISION DE L'ANTICIPATION DANS LE CONTROLE DU TRAFIC AERIEN | BOUDES NICOLE |
| NA97-587 | CR DE LA REUNION COORDINATION CENA/SCTA SUR L'ANALYSE D'EVENEMENTZ TCAS AVEC OSCAR | RAYNAUD BEATRICE |
| NT97-588 | ANALYSE DE L'EVENEMENT TCAS AFR531V DU 19.07.96 A CDG | AVENEAU CHRISTIAN |
| NT97-589 | CR D'EVALUATION COMPARATIVE ELSA R1.6/ELSA R1.1 | TACNET FRANCOISE |
| NT97-590 | CRR CAMELIA-GFH NO 14 DU 21.03.97 | POMIAN JEAN-LOUIS,COURTEIX SYLVIE |
| NR97-591 | MODELISATION ET EVALUATION GLOBALES DE LA SURETE DE FONCTIONNEMENT DU CAUTRA | FOTA NICOLAS |
| NT97-592 | BILAN DE L'ANALYSE DE L'EXISTANT SUR LE WEB | LEMAIRE MARIE-CHRISTINE,VICENTE ISABELLE |
| NT97-594 | ANALYSE DE L'EVENEMENT TCAS HLF180 DU 30.08.96 AU CRNA/E | AVENEAU CHRISTIAN |
| NA97-595 | RAPPORT DE PRESENTATION COMMANDE UGAP MATERIELS RESEAUX | KRINER BRUNO |
| NA97-596 | CCTP ERGONOMIE | TROILLARD ELISABETH |
| NT97-597 | CR REUNION DE DIVISION SAS DU 01.04.97 | VALLAURI ERIC |
| NT97-598 | MPPA-MODELLISATION OF AIRCRAFT WEIGHT IMPACT DURING A OBSCENT PHASE | CUYEU MICHEL |
| NA97-599 | ANNEXE TECHNIQUE 001 POUR LE MARCHE 96.12.064-BANC DE TEST DAARWIN | VELTEN JEAN-RAYMOND |
| NR97-600 | CHANGE REQUEST TO RTCA DO-185A : PROPOSAL TO REDUCE SPLIT RAS | ARINO THIERRY |
| NT97-601 | CAMELIA : CR REUNION DU 04.0497 SUR LE SUIVI DES DEVELOPPEMENTS SOL | MARCHE STEPHANE |
| NT97-602 | FONCTIONNALITES DE COOPERATION INTER-CENTRES DANS DAARWIN | PIVETTA DAVID |
| NT97-603 | CR 9EME REUNION GROUPE DE PILOTAGE CAMELIA | TAHMASSEBI SOPHIE |
| NT97-604 | ANALYSE DU DOSSIER D'ADP SUR LA PROCEDURE D'APPROCHES SIMULTANEES TRIPLES PARIS-CHARLES DE GAULLE ET PARIS-LE BOURGET | BANEGE LIONEL |
| NA97-605 | CCTP POUR UNE COMMANDE DANS LE CADRE D'UN CONTRAT D'ASSISTANCE TECHNIQUE PHARE-PERFORMANCES AVIONS PD3 | PIANETTI CHRISTELLE |
| NT97-606 | BILAN DU STAGE EXPERIMENTAL "RETOUR D'EXPERIENCE" AU CRNA/SO | FIGAROL SYLVIE |
| NT97-607 | SYNTHESE DES EXIGENCES SDF DANS LE DOMAINE AERONAUTIQUE | TOMCZAK FLORENCE |
| NT97-608 | ANALYSE PRELIMINAIRE DES RISQUES ERATO-VERSION 4 | GAUDIERE GERVAIS |
| NT97-609 | LISTE DES EXIGENCES ET RECOMMANDATIONS SDF POUR SYSTEME ERATO | GAUDIERE GERVAIS |
| NA97-610 | NOTE PRESENTATION CONVENTION ENAC RELATIVE A CERTAINES ETUDES ECONOMIQUES | ROBERT PATRICE |
| NT97-611 | REPORT OF TH KICK-OFF MEETING OF THE ARTAS DEPENDABILITY STUDY | GAUDIERE GERVAIS |
| NT97-612 | ARTAS DEPENDABILITY STUDY-ANNEX 1 | METGE SYLVAIN |
| NT97-613 | ARTAS DEPENDABILITY STUDY-INTERMEDIATE REPORT 1 | METGE SYLVAIN |
| NT97-614 | PATN-CONFIGURATION MANAGEMENT DOCUMENT EXTERNAL PRODUCTS | JEAN MATHIEU |
| NT97-615 | PATN-ARCHITECTURE FOR CENA/REAL AIRBORNE DEMONSTRATION-SLIDES PRESENTATION | MITTAUX-BIRON GERARD |
| NA97-616 | NOTE DE PRESENTATION UPS-IRIT | TROILLARD ELISABETH |
| NT97-617 | ANALYSE DE L'EVENEMENT TCAS HLF DU 13.07.96 AU CRNA SE | HASQUENOPH BERNARD |
| NR97-618 | FORMAL TRASDUCERS-MODELS OF DEVICES AND BUILDING BRICKS FOR HIGHLY INTERACTIVE SYSTEMS | PALANQUE PHILIPPE,ACCOT JOHNNY,CHATTY STEPHANE,MAURY SEBASTIEN |
| NR97-619 | UNE METAPHORE D'AIDE A LA STRUCTURATION DES APPLICATION INTERACTIVES | JACOMI MICHELE,CHATTY STEPHANE,PALANQUE PHILIPPE |
| NR97-620 | VERS L'UTILISATION DANS LE CONTROLE AERIEN DES ASPECTS TEMPORELS DE L'INTERACTION | CHATTY STEPHANE,BUSTICO ALEXANDRE |
| NR97-621 | AU DELA DE LA LOI DE FITTS DES MODELES POUR LES TACHES DE NAVIGATION DANS LES INTERFACES | ACCOT JOHNNY |
| NR97-622 | UN CADRE A LA CONCEPTION D'INTERFACES POUR LE COLLECTICIEL-LA COLLABORATION DIRECTE | SIRE STEPHANE |
| NR97-623 | FORMAL SPECIFICATION FOR DESIGNING USER INTERFACES OF ATC APPLICATIONS | PALANQUE PHILIPPE,PATERNO F,BASTIDE REMI |
| NT97-624 | NOTE DE PRESENTATION DE LA CONVENTION INSTN-CENA | CHATTY STEPHANE |
| NT97-625 | CR REUNION DU 22 AVRIL 1997 RELATIVE A SDF ERATO | GAUDIERE GERVAIS |
| NR97-626 | A MAKING MOVIES METAPHOR FOR STRUCTURING SOFTWARE COMPONENTS IN HIGHLY INTERACTIVE APPLICATION | JACOMI MICHELE,CHATTY STEPHANE,PALANQUE PHILIPPE |
| NT97-627 | CR EOLIA-1ER | MADDALENA CHRISTINE |
| NA97-628 | SICASP/W62 WORK PROGRAMME FOR SICASP/7 | CASAUX FRANCIS |
| NA97-629 | RAPPORT DE PRESENTATION MARCHE ETUDE ERGONOMIE CHRISTOL-CONSULTANT | TROILLARD ELISABETH |
| NT97-630 | PREV. ELEMENTS SUR PROTOCOLE DES EXPES ERATO AUTOMNE 1997 | LEROUX MARCEL |
| NA97-631 | CR REUNION DNA DU 2 AVRIL 1997 A ATHIS-MONS | HASQUENOPH BERNARD |
| NA97-632 | CR REUNIONS REMUE-MENINGES SUR WEB CENA | LEMAIRE MARIE-CHRISTINE |
| NT97-633 | REUNION CONCEPTION ET COGNITION DU GIS SCIENCES DE LA COGNITION-QUELQUES THEMES D'ETUDES ET METHODES DE TRAVAIL DU CENA | PREUX MURIEL,CHATTY STEPHANE,LEROUX MARCEL,LAVAL VERONIQUE |
| NA97-634 | PRESENTATION DU 2ND AVENANT A LA CONVENTION 95.C0018 ET DU 3E AVENANT A LA CONVENTION 94.C0022 | CHATTY STEPHANE |
| NA97-635 | PRESENTATION DU 1ER AVENANT A LA CONVENTION 96.C0022 | CHATTY STEPHANE |
| NT97-636 | POINT D'AVANCEMENT-ODYSSEE COMME MOYEN DE TEST DE GDS | BERGE DOMINIQUE |
| NT97-637 | REALISATION SUN LISSEUR MULTIRADAR | CHAMARD PATRICE |
| NT97-638 | PLAN DE REMPLACEMENT DES CENTRES EN ROUTE-CR DE LA 6E REUNION DU COMITE DE PILOTAGE | RASCLE DIDIER |
| NT97-639 | ANALYSE DE L'EVENEMENT TCAS AMM 331 DU 27.08.97 AU CRNA EST | HASQUENOPH BERNARD |
| NR97-640 | CHANGE REQUEST TO RTCA DO.185A-PROPOSAL TO IMPROVE SAFETY | ARINO THIERRY |
| NR97-641 | CHANGE REQUEST TO DO.185A-PROPOSAL TO REDUCE VERTICAL DEVIATIONS | CASAUX FRANCIS |
| NT97-642 | ANALYSE FONCTIONNELLE DU LOGICIEL MSAW | LEONARDUZZI JC |
| NT97-643 | CONCEPTION DU LOGICIEL MSAW | LEONARDUZZI JC |
| NT97-644 | TESTS DU LOGICIEL MSAW | LEONARDUZZI JC |
| NT97-645 | ENVIRONNEMENT DE DEVELOPPEMENT DU LOGICIEL MSAW | LEONARDUZZI JC |
| NT97-646 | COMPARAISON DES VERSIONS V0,V1 ET V2 DU LOGICIEL MSAW | LEONARDUZZI JC |
| NA97-647 | ANNEXE TECHNIQUE POUR UNE COMMANDE DANS LE CADRE DU MARCHE 96.12.063 DEVELOPPEMENT DE L'IHM DE CONTROLE NECESSAIRE AU PROJET EOLIA PARTIE 1 | TAHMASSEBI SOPHIE |
| NA97-648 | CR REUNION DOCTEURS DU 23.05.97 | BANEGE LIONEL |
| NA97-649 | CR REUNION DE DIVISION SAS DU 30 AVRIL 1997 | AVENEAU CHRISTIAN |
| NA97-650 | NOTE EXPLICATIVE DE PROLONGATION DE DELAIS POUR LE MARCHE A LOT CISI 96.030 | VELTEN JEAN-RAYMOND |
| NT97-651 | ANALYSE DE L'EVENEMENT TCAS HLF180 DU 30/08/96 AU CRNA/E | AVENEAU CHRISTIAN |
| NA97-652 | NOTE DE PRESENTATION DU 3EME AVENANT A LA CONVENTION N.CENA.95.C0005 | TAHMASSEBI SOPHIE |
| NA97-653 | CR DE LA 53EME REUNION DU COMITE SC147 DU RTCA-WASHINGTON 27-30 MAI 1997 | ARINO THIERRY |
| NT97-654 | CAMELIA-POINT TECHNIQUE DES SEANCES D'EXPERIMENTATION | MARCHE STEPHANE |
| NT97-655 | CR REUNION EXPERIMENTATION PHI1 DU 28.05.97 | ROBERT PATRICE |
| NT97-656 | PLAN DE REMPLACEMENT CR REUNION AVEC CELLULE TELECOM-STNA 8DC | MORTEVEILLE THIERRY |
| NT97-657 | DEBRIEFING EVALUATION FORMATION CAMELIA | POMIAN JEAN-LOUIS |
| NT97-658 | DEBRIEFING EXPERIMENTATION CAMELIA | POMIAN JEAN-LOUIS |
| NT97-659 | ANNEXE TECHNIQUE SUPPORT SYSTEMES SOUS UNIX | KRINER BRUNO |
| NT97-660 | WEB CENA-PREMIERES EVOLUTIONS | LEMAIRE MARIE-CHRISTINE,VICENTE ISABELLE |
| NT97-661 | REFLEXIONS SUR EOLIA ET LE PROGRAMME DE TRAVAIL ASSOCIE | TAHMASSEBI SOPHIE |
| NR97-662 | SAFETY COMPARISON OF TCAS 2 LOGICS-VERSION 6.04A AND CHANGE 7-USING THE ICAO STANDARD ENCOUNTER MODEL | ARINO THIERRY |
| NT97-663 | MPPA-COMPLEMENT D'ETUDE DE LA MODELISATION DES CONFIGURATIONS NON LISSES EN APPROCHE | CUYEU MICHEL |
| NA97-664 | CCTP POUR UNE MISSION D'ASSISTANCE TECHNIQUE AU DEVELOPPEMENT DE L'IHM PD3 | CAZARD BEATRICE |
| NT97-665 | UTILISATION DE LA PLATEFORME CAMELIA | MUSTIELES ARTHUR |
| NT97-666 | CR DE LA REUNION AAC-ICC-PII | MADDALENA CHRISTINE |
| NT97-667 | EXPERIMENTATION CAMELIA SUITE DES DEBRIEFING DES EXERCICES 255 ET 261 | POMIAN JEAN-LOUIS |
| NR97-668 | WHY CHANGE 7 IS NECESSARY IN THE EUROPEAN AIRSPACE | VALLAURI ERIC,CASAUX FRANCIS |
| NA97-669 | CR 53EME REUNION DE DIVISION SAS DU 10 JUIN 1997 | ARINO THIERRY |
| NT97-670 | PRESENTATION POWER POINT DU SYNOPTIQUE CENA-WEB | LEMAIRE MARIE-CHRISTINE,VICENTE ISABELLE |
| NT97-671 | BILAN DE LA COOPERATION FAA-EUROCONTROL SUR LE CRM ET LES SEPARATIONS | BANEGE LIONEL |
| NT97-672 | PREMIERS ELEMENTS D'ARCHIVAGE POUR LA DESCRIPTION DES SIMULATIONS ERATO | PARISE ROBERT |
| NT97-673 | NOTE DE SYNTHESE SUR L'ETUDE POURSUITE ENRICHIE | TACNET FRANCOISE |
| NT97-674 | ANALYSE DE L'EVENEMENT TCAS CKT952 DU 13.08.96 AU CRNA NORD | HASQUENOPH BERNARD |
| NT97-675 | REUNION DOSSIER STC-STS | TROILLARD ELISABETH |
| NT97-676 | CR REUNION CAMELIA GFH NO 16 DU 09.06.97 | COURTEIX SYLVIE |
| NA97-677 | ANNEXE TECHNIQUE POUR UNE COMMANDE DS MARCHE D'ASSISTANCE TECHNIQUE 97.031-SIMULATEUR MASS | PIANETTI CHRISTELLE |
| NT97-678 | TRAFFIC WITH SUBNETWORK PRIORITY 14 ON AMSS | KIRCHER THOMAS |
| NT97-679 | ANALYSE DE L'EVENEMENT TCAS IT-RH DU 11.09.96 AU CRNA SUD-EST | HASQUENOPH BERNARD |
| NT97-680 | MASS USER'S GUIDE V3.2 | MASS TEAM |
| NR97-681 | NON SMOOTH ROBUST STABILIZATION OF A GLASS OF TWO-DIMENTIONAL NONLINEAR SYSTEMS | HO-MOCK-QAI BERTINA |
| NT97-682 | ANNEXE TECHNIQUE POUR UNE COMMANDE DU MARCHE 96.12.051-ANALYSE DES FAITS TECHNIQUES DU CESNAC-ETUDE SDF ERATO | GAUDIERE GERVAIS |
| NT97-683 | ANNEXE TECHNIQUE POUR UNE COMMANDE DU MARCHE 96.12.051-ETUDES SDF PHIDIAS-ODS FRANCE | GAUDIERE GERVAIS |
| NT97-684 | ANNEXE TECHNIQUE POUR UNE COMMANDE DU MARCHE 96.12.051-PLAN DE REMPLACEMENT DES CRNA | GAUDIERE GERVAIS |
| NT97-685 | COMMENTAIRES CENA SUR STS | TROILLARD ELISABETH |
| NT97-686 | CR REUNION-EQUIPE MCS BRETIGNY | ESTEBAN OLIVIER |
| NT97-687 | ANALYSE EVENEMENT TCAS RGI 325 DU 30.09.96 AU CRNA-SE | HASQUENOPH BERNARD |
| NT97-688 | ANALYSE EVENEMENT TCAS SAB 952 DU 1.10.96 AU CRNA-EST | HASQUENOPH BERNARD |
| NT97-689 | EVALUATION SITUATION EXPERIMENTALE DE CAMELIA-QUELLE REPRESENTATIVITE DES DONNEES | COURTEIX SYLVIE |
| NT97-690 | ARTAS-DEPENDABILITY STUDY-CRITICAL REVIEW 1 SUPPORT DOCUMENT | METGE SYLVAIN |
| NT97-691 | CR REUNION MATERIEL AUDIO ET VIDEO DU 13.06.97 | PARISE ROBERT |
| NT97-692 | AIDES A LA PRESENTATION DE MODES OPERATOIRES | FOIS CHRISTOPHE |
| NT97-693 | ANALYSE DE L'EVENEMENT TCAS BBB 180 DU 01.10.96 AU CRNA-SO | HASQUENOPH BERNARD |
| NT97-694 | ANALYSE DE L'EVENEMENT TCAS IT-EW DU 08.10.96 AU CRNA-O | HASQUENOPH BERNARD |
| NA97-695 | EMERALD-WP5 PROJECT PLAN | CASAUX FRANCIS |
| NT97-696 | CR 1ERE REUNION DE COORDINATION AAC POUR PROJET EOLIA | TAHMASSEBI SOPHIE |
| NT97-697 | CHANTIER CENA 2 ; REUNION DU 2 JUILLET 1997 | BRILLAUD PHILIPPE |
| NT97-698 | RAPPORT COMMUN FRANCO-SUISSE | ROBERT PATRICE |
| NT97-699 | RAPPORT COMMUN FRANCO-SUISSE-NOTE DE SYNTHESE | ROBERT PATRICE |
| NA97-700 | RAPPORT DE PRESENTATION COMMANDE ISTA-EPIC MATERIEL MICRO-INFORMATIQUE | KRINER BRUNO |
| NA97-701 | ACAS STUDY PROPOSAL-A PC VERSION OF RITA FOR EUROPEAN STATES | VALLAURI ERIC |
| NT97-702 | UN WIDGET POUR LES APPLICATIONS ASAS-LE CDTI | VALLAURI ERIC |
| NT97-703 | ARTAS DEPENDABILITY STUDY-MINUTES OF THE CRITICAL REVUE | METGE SYLVAIN |
| NA97-704 | ANNEXE TECHNIQUE POUR COMMANDE DU MARCHE 96.12.063-MAINTENANCE CAMELIA ET PREMIERS DEVELOPPEMENTS DE LA PLATEFORME EOLIA PARTIE I | TAHMASSEBI SOPHIE |
| NT97-705 | COMMENTAIRE RECUEILLIS LORS DES SESSIONS DE SIMULATION ODYSSEE D'AVRIL/MAI/JUIN 97 | HERMAN E |
| NT97-706 | BILAN DES SIMULATIONS ODYSSEE | HERMANN ERIC |
| NT97-707 | CR REUNION AVEC LE CESNAC LE 28.05.97 | RASCLE DIDIER |
| NT97-708 | SYNTHESE DE PRESENTATION DU PLAN DE REMPLACEMENT | RASCLE DIDIER,MORTEVEILLE THIERRY |
| NT97-709 | CR REUNION 5NM DU 01.07.97 | MORTEVEILLE THIERRY |
| NT97-710 | ATNP ARCHIVE AND ELECRONIC MAILING LISTS | TAMALET STEPHANE,KIRCHER THOMAS |
| NA97-711 | ANNEXE TECHNIQUE POUR COMMANDE DU MARCHE 96.12.063-GESTION CONFIGURATION POUR DEVELOPPEMENTS EOLIA PARTIE 1 ET DEVELOPPEMENT IHM CONTROLE PLATEFORME EOLIA PARTIE 1 | TAHMASSEBI SOPHIE |
| NA97-712 | ACAS STUDY PROPOSAL-EVALUATION OF TCAS 2 VERSION 7.0 IN EUROPEAN AIRSPACE | ARINO THIERRY |
| NT97-713 | ANALYSE DE L'EVENEMENT TCAS HLF862 DU 09.10.96 AU CRNA-E | HASQUENOPH BERNARD |
| NT97-714 | ANALYSE DE L'EVENEMENT TCAS LTU104 DU 17.10.96 AU CRNA-SE | HASQUENOPH BERNARD |
| NA97-715 | CR 54EME REUNION DE LA DIVISION SAS DU 10 JUILLET 1997 | MIQUEL THIERRY |
| NA97-716 | ANNEXE TECHNIQUE POUR COMMANDE DU MARCHE 96.12.063-EVOLUTION DE LA PLATE-FORME OSMOSE-DEVELOPPEMENT DES SUJETS TOCCATA ET MEFISTO | CHATTY STEPHANE |
| NT97-717 | CR REUNION DAARWIN DU 15.07.97 | MARCHE STEPHANE |
| NT97-718 | CR REUNION TECHNIQUE-EQUIPES AAC-ICC DU 16.07.97 | LAPASSET LAURENT |
| NT97-719 | CR REUNION D'INFORMATION DU 16.07.97-PATN-EOLIA | KAPP VINCENT |
| NT97-720 | CONTRAINTES POUR LA GENERATION DE RESEAUX SIMULES PAR ODYSSEE | GEANDILLOU ALAIN |
| NT97-721 | INTRODUCTION AUX OUTILS DE FORMATION A LA MAINTENANCE OPERATIONNELLE | GEANDILLOU ALAIN |
| NA97-722 | CCTP POUR UNE COMMANDE DANS LE CADRE D'UN CONTRAT D'ASSISTANCE TECHNIQUE PHARE-BDT DAARWIN-PD3 | VELTEN JEAN-RAYMOND |
| NA97-723 | ANNEXE TECHNIQUE-ASSISTANCE AUX ETUDES ET DEVELOPPEMENTS DE LA DIVISION SAS-LOGIQUES D'ANTIABORDAGE ET DE MAINTIEN DE LA SEPARATION-. | CASAUX FRANCIS |
| NA97-724 | NOTE DE PRESENTATION DU SECOND AVENANT A LA CONVENTION ADERMIP.CENA.96.C0012-ANNEE 1997 | PREUX MURIEL |
| NT97-725 | ANALYSE DE L'EVENEMENT TCAS SWR110 DU 17.11.96 AU CRNA-NORD | VALLAURI ERIC |
| NT97-726 | COMMENTAIRES SUR PRESENTATION FAP AU SCTA ET CENA | ROBERT PATRICE |
| NT97-727 | IMPACT DE L'INTEGRATION DE L'ACAS POUR MCS DANS L'ARCHITECTURE DE SIMULATION DU CENA | ESTEBAN OLIVIER,VALLAURI ERIC |
| NA97-728 | CCTP-ASSISTANCE POUR LES PROJETS ADS-EUROPE,EOLIA ET LES MODELISATIONS ATN | KIRCHER THOMAS |
| NT97-729 | ASSISTANCE TECHNIQUE DE NICOLAE FOTA POUR L'ETUDE DE SURETE DE FONCTIONNEMENT DU SYSTEME ARTAS | METGE SYLVAIN |
| NT97-730 | LE SOUTIEN APRES INCIDENT : ENJEUX ET MISE EN OEUVRE | FIGAROL SYLVIE |
| NA97-731 | CCTP POUR UNE COMMANDE DANS LE CADRE D'UN CONTRAT D'ASSISTANCE TECHNIQUE PHARE-SIMULATEUR MASS | PIANETTI CHRISTELLE |
| NA97-732 | CCTP POUR UNE COMMANDE DANS LE CADRE D'UN CONTRAT D'ASSISTANCE TECHNIQUE PHARE-BANC D'ESSAI DAARWIN | PIANETTI CHRISTELLE |
| NT97-733 | ANALYSE DE L'EVENEMENT TCAS BAL484B DU 21.10.96 AU CRNA EST | HASQUENOPH BERNARD |
| NA97-734 | CR DE LA 26EME REUNION DU GROUPE DE TRAVAIL WG2 DU GROUPE D'EXPERTS SICASP DE L'OACI-OTTAWA 23-27 JUIN 1997 | ARINO THIERRY |
| NT97-735 | CR 2EME REUNION DE COORDINATION AAC POUR EOLIAJ.J | GUIBERT JEAN-JACQUES |
| NT97-736 | SYNTHESE DE L'IMPACT SUR PERICLES DES DEFAILLANCES EXTERNES A PHIDIAS | GAUDIERE GERVAIS |
| NT97-737 | IMPACT DES DEFAILLANCES DES DONNEES EXTERNES SUR PERICLES | GAUDIERE GERVAIS |
| NT97-738 | ANNEXE TECHNIQUE RELATIVE A L'ETUDE SDF DANS LE CADRE DE L'ABAISSEMENT DE LA NORME DE SEPARATION A 5 NM | PEYTAVIN ALAIN |
| NT97-739 | ANALYSE DE L'EVENEMENT TCAS AEL 702 DU 28.10.96 AU CRNA SE | HASQUENOPH BERNARD |
| NA97-740 | NOTE DE PRESENTATION DU PREMIER AVENANT A LA CONVENTION ADERMIP-CENA-96.C0018 | TAHMASSEBI SOPHIE |
| NT97-741 | CR REUNION ESV-SAS SUR LA MISE EN OEUVRE DE DIS DU 20.08.97 | PIVETTA DAVID |
| NA97-742 | ANNEXE TECHNIQUE POUR UNE COMMANDE DANS LE CADRE DU MARCHE D'ASSISTANCE TECHNIQUE 96.12.025-SIMULATEUR MASS | PIANETTI CHRISTELLE |
| NT97-743 | ANALYSE EVENEMENT TCAS AFR-'-E DU 10.11.96 A CDG | HASQUENOPH BERNARD |
| NT97-744 | PD3 OPERATIONAL MEMO | CAZARD BEATRICE |
| NT97-745 | BANC DE TEST DAARWIN-AVANCEMENT ET TRAVAUX PREVUS-MARS 1997 | ESTIENNE MICHEL |
| NT97-746 | BANC DE TEST DAARWIN-AVANCEMENT ET TRAVAUX PREVUS-SEPT 1997-. | ESTIENNE MICHEL |
| NT97-747 | SERVICES PERICLES ET DEFAILLANCES EXTERNES | GAUDIERE GERVAIS |
| NT97-748 | ANALYSE DES DONNEES DES EXPERIMENTATIONS DRUIDE V1 | COURTEIX SYLVIE |
| NT97-749 | GESTION DES ESPACES DE REFERENCE ET DE DEVELOPPEMENT DU PROJET EOLIA | LAPASSET LAURENT |
| NT97-750 | ANALYSE DE L'EVENEMENT TCAS BAL 127B DU 02/12/96 | HASQUENOPH BERNARD |
| NT97-751 | PLAN DE REMPLACEMENT : REUNION DE PRESENTATION DU PROJET A LA DNA 05/09/97 | RASCLE DIDIER |
| NT97-752 | EOLIA : SOFTWARE ARCHITECTURE OD ADER | MARCHE STEPHANE,MUSTIELES ARTHUR |
| NT97-754 | EOLIA : DOCUMENTATION TECHNIQUE | MARCHE STEPHANE |
| NT97-755 | EOLIA : SPECIFICATION IHM V0.0 | MADDALENA CHRISTINE |
| NR97-756 | COORDINATIONS AU CRNA/SO | UNINSKI HELENE |
| NA97-758 | ANNEXE TECHNIQUE POUR 1 COMMANDE DS LE CADRE DU MARCHE 96.12.063 DEVELOPPEMENT DES POSTES PSEUDO ADJACENT ET SUPERVISION PR LA PLATE FORME DE SIMULATION EOLIA PARTIE I | TAHMASSEBI SOPHIE |
| NA97-759 | CPTE RENDU DE LA 5ME REUNION DE LA DIVISION SAS DU 28/09/97 | RAYNAUD BEATRICE |
| NA97-760 | CR DE LA 3ME REUNION DE COORDINATION PROJET EOLIA | LASSERRE ANNABEL |
| NA97-761 | CAHIER DES CLAUSES TECHNIQUES PARTICULIERES POUR ASSISTANCE SUR LE PROJET PATN | KIRCHER THOMAS |
| NT97-762 | MODELISATION DE LA CHAINE RADIO POUR ODYSSEE | LORON THIERRY |
| NT97-763 | ETUDES SDF DS LE CADRE DE L'ABAISSEMENTE LA NORME DE SEPARATION A 5 NM | TOMCZAK FLORENCE |
| NR97-764 | TCAS 2 VERSION 7.0 SAFETY STUDY | ARIMS T |
| NT97-765 | REUTILISATION DE COMPOSANTS EURATN DANS CAMELIA | MARCHE STEPHANE |
| NT97-766 | PRELIMINARY DESIGN OF THE CAMELIA RDV1 APPLICATION PROCESS | MARCHE STEPHANE |
| NT97-768 | CENA PD/3 SIMULATION FACILITY INTEGRATION PLAN | BONGERS P |
| NT97-769 | CPTE RENDU DE LA REUNION DU 12/09/97 RELATIVE A LA SDF ERATO | GAUDIERE GERVAIS |
| NA97-770 | PROPOSITION DE SUJET IENAC S95 CARACTERISATION DES FLUX DE TRAFIC AERIEN CENA SAS | MIQUEL THIERRY |
| NA97-771 | CCTP ASSISTANCE TECHNIQUE POUR L'IHM ERATO | MARAIS FRANCOIS |
| NA97-772 | ANNEXE TECHNIQUE BON DE COMMANDE MARCHE 97.12.026. ANALYSE DES DONNEES ENREGISTREES SUR ODYSSEE | BERGE DOMINIQUE |
| NT97-773 | SYNTAXE ET FORMAT DES MESSAGES ECHANGES PAR DRUIDES V1 AVEC L'IHM CONTROLEUR | NOVALES LUC |
| NA97-774 | CPTE RENDU SUR LES PROBLEMES ADMINISTRATIFS DU CENA TLSE AU 22/09/97 | COLIN-DE-VERDIERE DOMINIQUE |
| NR97-775 | ROBUST EXPONENTIAL STABILIZATION OF PARAMETERIZED FAMILIES OFLTI SYSTEMS BY MEANS OF NONLINEAR TIME VARYING STATE FEEDBACK | HO-MOCK-QAI BERTINA |
| NT97-776 | PROJET PLAN DE REMPLACEMENT CRNA PRESENTATION DE LA SOLUTION | MORTEVEILLE THIERRY |
| NT97-777 | CPTE RENDU DE LA DEMONSTRATION FMS/A340 A L'AEROSPATIALE DU 17/09/97 | RAYNAUD BEATRICE |
| NT97-778 | FORMATION A ERATO 97-98 | LEROUX MARCEL |
| NT97-781 | PROJET D'EVALUATION DE DUOCOORD | KARSENTY LAURENT,PREUX MURIEL |
| NT97-782 | DRUIDES PRESENTATION | TAHMASSEBI SOPHIE |
| NT97-783 | ARTAS DEPENDABILITY STUDY MINUTES OF THE WORKING MEETING 25/26 SEPT 97 | METGE SYLVAIN |
| NT97-784 | ANALYSE DE L'EVENEMENT TCAS AFR7020 DU 26.12.96 A CDG | HASQUENOPH BERNARD |
| NT97-785 | ANALYSE DE L'EVENEMENT TCAS RG385XT DU 01.10.96 A MARSEILLE PROVENCE | HASQUENOPH BERNARD |
| NR97-786 | THE ASAS CROSSING PROCEDURE | CASAUX FRANCIS |
| NA97-787 | THE EMERALD PROJECT : WP5 PROJECT PLAN | CASAUX FRANCIS |
| NA97-788 | CCTP POUR 1 MARCHE D'ETUDES EN ERGONOMIE | TROILLARD ELISABETH |
| NT97-789 | ERATO DES ETUDES AU MONDE REEL | LEROUX MARCEL,ROBERT PATRICE |
| NT97-790 | RESSOURCES D EXPERIMENTATIONS SITE TOULOUSE | ROBERT PATRICE |
| NR97-791 | PRELIMINARY CONTRIBUTION FOR TLSE ACAS III PERFORMANCE SARPS | ARINO THIERRY |
| NT97-792 | LE TRM EN FRANCE : ENJEUX ET MISE EN OEUVRE | FIGAROL SYLVIE |
| NT97-793 | | BERGE DOMINIQUE |
| NA97-794 | ANNEXE TECHNIQUE POUR ASSISTANCE SUR LES ETUDES DE DEFINITION DE L'ATN | KIRCHER THOMAS |
| NT97-795 | CR REUNION AVEC CESNAC DS LE CADRE DU PLAN DE REMPLACEMENT | RASCLE DIDIER,MORTEVEILLE THIERRY |
| NA97-796 | CCTP POUR ASSISTANCE SUR LE PROJET PATN | KIRCHER THOMAS |
| NT97-797 | CR REUNION STNA 7 P/CENA SUR DU 03/09 SUR LE SECOURS ULTIME MULTI RADARDE PHIDIAS | TACNET FRANCOISE |
| NT97-798 | EOLIA CR DE REUNION TECHNIQUE AAC/ESV/ICC DU 06/10/97 | MARCHE STEPHANE |
| NA97-799 | ANNEXE TECHNIQUE DS LE CADRE DU MARCHE 96.12.065 (IHM EN ROUTE PD/3) | CAZARD BEATRICE |
| NA97-800 | ANNEXE TECHNIQUE DS LE CADRE DU MARCHE MIXTE 97.031 | CAZARD BEATRICE |
| NT97-801 | DOCUMENT DE CONCEPTION DE L'IHMER PD/3 | |
| NT97-802 | TYPES DE L'API CDPLC EOLIA ET CONVERSIONS PRO ATN/API | MUSTIELES ARTHUR |
| NA97-803 | ANNEXE TECHNIQUE POUR ASSISTANCE DUR LE PROJET PATN | KIRCHER THOMAS |
| NA97-804 | ANNEXE TECHNIQUE PR 1 COMMANDE DS LE CADRE DU MARCHE 96.12.063. POURSUITE DES DEVELOPPEMENTS DE LA PLATE FORME EOLIA PARTIE I | TAHMASSEBI SOPHIE |
| NA97-805 | CTE RENDU REUNION DE DIRECTION DU 07/10/97 | ROBERT PATRICE |
| NA97-806 | ANNEXE TECHNIQUE PR ASSISTANCE SUR LA PLATE FORME ATN EXPERIMENTALE ET LE PROJET PATN | KIRCHER THOMAS |
| NA97-807 | ANNEXE TECHNIQUE POUR UNE COMMANDE DS LE CADRE DU MARCHE D'ASSISTANCE TECHNIQUE 97.12.031. SIMULATEUR MASS | PIANETTI CHRISTELLE |
| NA97-808 | ANNEXE TECHNIQUE PR 1 COMMANDE DS LE CADRE DU MARCHE D'ASSISTANCE TECHNIQUE 96.12.064. BANC DE TEST DAARWIN | PIANETTI CHRISTELLE |
| NA97-809 | ANNEXE TECHNIQUE PR 1 COMMANDE DS LE CADRE DU MARCHE D'ASSISTANCE TECHNIQUE 96.12.025. SIMULATEUR MASS | PIANETTI CHRISTELLE |
| NA97-810 | ANNEXE TECHNIQUE PR 1 COMMANDE D'ASSISTANCE TECHNIQUE PR LE MARCHE 96.12.025. SIMULATEUR MASS | PIANETTI CHRISTELLE |
| NA97-811 | CCTP PR 1 COMMANDE DS LE CADRE D'1 CONTRAT D'ASSISTANCE TECHNIQUE PHARE | PIANETTI CHRISTELLE |
| NA97-812 | CR DE LA 56EME REUNION DE DIVISION SAS DU 30.09.97 | HASQUENOPH BERNARD |
| NA97-813 | ANNEXE TECHNIQUE PR 1 COMMANDE DS LE CADRE DU MARCHE 96.12.036. INTEGRATION DE L'IHM DE CONTROLE EOLIA PARTIE 1 AVEC LE SYSTEME SOL I SIMULE | TAHMASSEBI SOPHIE |
| NA97-814 | ANNEXE TECHNIQUE PR 1 COMMANDE DS LE CADRE DU MARCHE 96.12.036. POURSUITE DES DEVELOPPEMENTS DE L'IHM DE CONTROLE EOLIA PARTIE I | TAHMASSEBI SOPHIE |
| NT97-815 | DIRECT COLLABORATION FOR INTER SECTORS COORDINATION | CHATTY STEPHANE,JACOMI MICHELE |
| NT97-816 | COMPARAISON ELISA/DACOTA DS LE CONTEXTE D'ADP | TACNET FRANCOISE,ROUX SERGE |
| NT97-817 | COMPARAISON DES API PRO ATN-PATN | LECLERCQ AGNES |
| NA97-818 | EUROPEAN ACAS STUDY MAIN DOMAINS OF INTEREST FOR CENA | ARINO THIERRY |
| NT97-819 | ETUDES PRELIMINAIRES POMO | LOUZE PIERRE-HENRI |
| NT97-820 | SPECIFICATION POMO PR LES EXPERIMENTATIONS DE POMO 1 | LOUZE PIERRE-HENRI |
| NT97-821 | DAARWIN PROGRAMMER'S GUIDE AIRSPACE SERVER | PERENNOU TANGUY |
| NT97-822 | NOTE DE PRESENTATION DE LA CONVENTION ADERMIP/CENA 97/C0033 | CHATTY STEPHANE |
| NT97-823 | CR DE LA REUNION DE COORDINATION EOLIA DU 14/10/97 | MUSTIELES ARTHUR |
| NA97-824 | DEMANDE BUDGETAIRE D'EQUIPEMENT INSTALLATIONS DU CENA TLSE PR L'ANNEE 98 | KRINER BRUNO |
| NT97-825 | ANNEXE TECHNIQUE AU BON DE COMMANDE PR ASSISTANCE AU CAHIER DES CHARGES EAO | FIGAROL SYLVIE |
| NT97-826 | ANNEXE TECHNIQUE AU BON DE COMMANDE PR ASSISTANCE A LA FORMATION CHEF DE TOUR | FIGAROL SYLVIE |
| NT97-827 | ANNEXE TECHNIQUE AU BON DE COMMANDE PR L'INTERVENTION DS LE STAGE EXPERIMENTAL RETOUR D'EXPERIENCE | FIGAROL SYLVIE |
| NT97-828 | ANNEXE TECHNIQUE AU BDC PR L'ASSISTANCE A L'ADAPTATION DU TRM | FIGAROL SYLVIE |
| NA97-829 | ANNEXE TECHNIQUE MARCHE 96.12.066 BANC DE TEST DAARWIN | VELTEN JEAN-RAYMOND |
| NA97-830 | ANNEXE TECHNIQUE MARCHE 96.12.065 BANC DE TEST DAARWIN | VELTEN JEAN-RAYMOND |
| NT97-831_1 | EVALUATION PRECISIONS ELISA R7 PR LE CRNA/NORD | BOUSQUET CATHERINE |
| NT97-832 | SDF PR GROUPE DE PILOTAGE ODS FRANCE07/11/97 | METGE SYLVAIN |
| NT97-833 | PLAN DE REMPLACEMENT CRNA. CR DE LAREUNION AVEC STN8/DC | MORTEVEILLE THIERRY |
| NT97-834 | PLAN DE REMPLACEMENT CRNA. 7ME REUNION DU COMITE DE PILOTAGE | MORTEVEILLE THIERRY |
| NT97-835 | PROTOCOLE D'EXPERIMENTATIONS PR L'EVALUATION D'ERATO : PREMIERES REFLEXIONS | BOUDES NICOLE |
| NT97-836 | PLAN DE REMPLACEMENT CRNA. CR DE REUNION AVEC STNA/3 ET STNA/5 | MORTEVEILLE THIERRY |
| NT97-837 | MODE D'EMPLOI ERATO | ABDESSLEM SONIA |
| NT97-838 | PROTOCOLE D'EVALUATION DU MODELE COGNITIF DU CONTROLEUR EN ENVIRONNEMENT ERATO | BOUDES NICOLE |
| NT97-839 | POINT D'AVANCEMENT POMO 1 | TROILLARD ELISABETH |
| NT97-840 | OBJECTIFS ET ORGANISATION DES EXPERIMENTATIONS POMO 1 | HERMANN ERIC |
| NT97-841 | EMERGENCE DE POLES DE COMPETENCE PAR SPECIALITE | HERMANN ERIC |
| NT97-842 | ETABLISSEMENT D'UN CONTRAT DE SERVICE | HERMANN ERIC,FOIS CHRISTOPHE |
| NT97-843 | CPTE RENDU DE LA 18ME REUNION DU GROUPE FACTEUR HUMAIN | COURTEIX SYLVIE |
| NT97-844 | ARCHIVAGES DES DONNEES ODYSSEE | HINGREZ P |
| NT97-845 | IONALE DU TRM | FIGAROL SYLVIE |
| NA97-846 | CCTP PR LA REALISATION ET DIFFUSION DU PORTAGE DE RITA SUR PC | VALLAURI ERIC |
| NA97-847 | CPTE RENDU DE LA 27ME REUNION DU GROUPE DE TRAVAIL WG2 DU GROUPE D'EXPERTS SICASP DE L'OACI (HONOLULU 20/24 OCT 97) | ARINO THIERRY |
| NT97-848 | ANNEXE TECHNIQUE PR ETUDES SDF (NORMES 5NM ARTEMIS SAFETEY CASE) | PEYTAVIN ALAIN |
| NA97-849 | NOTE DE PRESENTATION DU PREMIER AVENANT A LA CONVENTION NEB/CENA/97.C0003 | TAHMASSEBI SOPHIE |
| NT97-850 | PLAN DE REMPLACEMENT CRNA. CR DE REUNION AVEC STNA/8C | MORTEVEILLE THIERRY |
| NA97-851 | ANNEXE TECHNIQUE MARCHE 96.12.064 PROJET CMS/PARADISE | VELTEN JEAN-RAYMOND |
| NA97-852 | ANNEXE TECHNIQUE MARCHE 96.12.064. BANC DE TEST DAARWIN PATIO | VELTEN JEAN-RAYMOND |
| NT97-853 | COMPTE REDNU DE LA 4EME REUNION DE COORDINATION EOLIA 14/10/97 | MUSTIELES ARTHUR |
| NT97-854 | ERATO : L'AGENDA. SPECIFICATION EXTERNE DE LA GESTION DES PROBLEMES VERSION PROVISOIRE | LOUYOT PHILIPPE |
| NA97-855 | CTE RENDU REUNION GROUPE DE TRAVAIL RGCSP BRUXELLES 06/10/97 17/10/97 | MALESCOT DIDIER |
| NA97-856 | NOTE DE PRESENTATION A LA CONVENTION CENA/CRIS97/C00RX | FIGAROL SYLVIE |
| NA97-857 | ANNEXE TECHNIQUE DS LE CADRE DU MARCHE 97.12.031 | CAZARD BEATRICE |
| NT97-858 | CPTE RENDU DE LA DEUXIEME REUNION TECHNIQUE EOLIA DU 05/11/97 | MARCHE STEPHANE |
| NT97-859 | NOTE CONCERNANT L'INSTALLATION DU RESEAU FDDI | HERMANN ERIC |
| NA97-860 | NOTE DE PRESENTATION DU 3ME AVENANT A LA CONVENTION ADERMIP/CENA 95/C0018 | CHATTY STEPHANE |
| NT97-861 | BILAN D'ACTIVITES DE W MACKAY AU CENA AU TITRE DE LA 1RE ANNEE DE LA CONVENTION 96 C0012 | PREUX MURIEL,MACKAY WENDY |
| NA97-862 | CPTE RENDU DU FORUM DE DIRECTION DU 04/11/97 | TAHMASSEBI SOPHIE |
| NT97-863 | ANNEXE TECHNIQUE SUPPORT SYSTEME SOUS UNIX | KRINER BRUNO |
| NT97-864 | NOTE DE PRESENTATION DU SECOND AVENANT A LA CONVENTION ADERMIP/CENA 96/C0012 | PREUX MURIEL |
| NA97-864 | NOTE DE PRESENTATION DU SECOND AVENANT DE LA CONVENTION ADERMIP/CENA 96/C0012 | PREUX MURIEL |
| NA97-865 | NOTE DE PRESENTATION DU 3ME AVENANT A LA CONVENTION CRIIS/CENA/95/C0017 | FIGAROL SYLVIE |
| NT97-866 | SPECIFICATION DU TROUBLEMAKER | LECLERCQ AGNES |
| NT97-868 | PLAN DE REMPLACEMENT CRNA CPTE RENDU DE LA REUNION AVEC STNA/7 DU 12/11/97 | MORTEVEILLE THIERRY |
| NT97-869 | PROTOCOLE D'EXPERIMENTATION ERATO : ETUDE DE LA COOPERATION ET EVALUATION DES OUTILS D'AIDE A LA DECISION | BRESSOLLE MARIE-CHRISTINE,LEROUX MARCEL |
| NT97-870 | CPTE RENDU DE LA 5ME REUNION DE DIVISION EOLIA | LAPASSET LAURENT |
| NA97-871 | PRESENTATION DU 2ME AVENANT A LA CONVENTION CENA/ADERMIP 96/C0022 | CHATTY STEPHANE |
| NA97-872 | PRESENTATION DE LA CONVENTION CENA/NEB 97/C0037 | CHATTY STEPHANE |
| NT97-873 | ELEMENTS SUR L'UTILISABILITE DE L'ENVIRONNEMENT ERATO | PARISE ROBERT |
| NR97-874 | QUELLES COOPERATIONS ENTRE ERGONOMES,CHERCHEURS ET INTERVENANTS ? | HERMANN ERIC,LASSERRE ANNABEL |
| NT97-875 | RECOMMANDATION ISSUES DE L'ETUDE SDF DES SYSTEMES EXTERNES ERATO | TOMCZAK FLORENCE |
| NT97-876 | PLAN DE REMPLACEMENT CRNA : CPTE RENDU DE REUNION AVEC STNA/7 | MORTEVEILLE THIERRY |
| NA97-877 | CR ATELIER COMMUNICATION ELECTRONIQUE SEMINAIRE COMMUNICATION ST AUBAN 18/20 NOV 97 | LEMAIRE MARIE-CHRISTINE |
| NR97-878 | PROPOSITION DE COMMUNICATION HCI 98. QUELLE UTILISATION COMPLEMENTAIRE DES LIAISONS DE DONNEES ET DE LA PHONIE ENTRE PILOTES ET CONTROLEURS EN SITUATION DE SIMULATION | COURTEIX SYLVIE |
| NA97-879 | CPTE RENDU DE LA 57ME REUNION DE DIVISION DU 13/11/97 | MARTINON DOMINIQUE |
| NA97-880 | ADSP-SICASP/WG2 WORK ON ASAS | CASAUX FRANCIS |
| NA97-881 | ADSP-THE ASAS CROSSING PROCEDURE | CASAUX FRANCIS |
| NA97-882 | PROGRESS REPORT FOR THE REALISATION OF THE EUROPEAN PC VERSION OF RITA | VALLAURI ERIC |
| NT97-886 | CPTE RENDU REUNION 24/10/97 EVOLUTION MISSION | TROILLARD ELISABETH |
| NT97-887 | MANUEL DE REFERENCE D'OUTIDEX | NOVALES LUC |
| NT97-888 | ERATO : AGENDA. SPECIFICATIONS REALISEES OCT 97 | LOUYOT PHILIPPE |
| NT97-889 | L'ARCHITECTURE ET TRANSFERT D'INFORMATIONS ENTRE STS ET STC | TROILLARD ELISABETH |
| NT97-890 | PROBLEMES DE SPECIFICATION DANS LE PROJET EOLIA | MADDALENA CHRISTINE |
| NT97-891 | COMPTE-RENDU DE LA SIXIEME REUNION DE COORDINATION EOLIA DU 02/12/97 | COURTEIX SYLVIE |
| NA97-892 | ANNEXES TECHNIQUE ASSISTANCE AUX ETUDES ET DEVELOPPEMENTS DE LA DIVISON SAS | CASAUX FRANCIS |
| NR97-893 | URGENCE ET GRAVITE DANS LES CONFLITS PLANS A DEUX AVIONS | LAPASSET LAURENT |
| NT97-894 | ARTAS DEPENDABILITY STUDY CRITICAL RESUN.2 SUPPORT DOCUMENT | METGE SYLVAIN |
| NA97-895 | COMPTE-RENDU DE LA REUNION DE DIRECTION DU 8/12/97 | DELAHAYE DANIEL |
| NT97-896 | QUESTION SUR LE HARD WARE D ARTAS | TOMCZAK FLORENCE |
| NR97-897 | VERS DES INTERFACES A COLLABORATION DIRECTE POUR LE TRAVAIL DE GROUPE VERSION COURTE | CHATTY STEPHANE,SIRE STEPHANE |
| NT97-898 | ARTAS DEPENDABILITY STUDY. MINUTES OF THE CRITICAL REVIEW N.2. | METGE SYLVAIN |
| NT97-899 | NOTE SUR LA PROCEDURE EVALUER L'IMPACT DES MODIFS DU STR SUR LA PRECISION | TOMCZAK FLORENCE |
| NA97-900 | TEN PROJECT. WORK PLAN FOR WR3 WP6 AND WP8. | ARINO THIERRY |
| NA97-901 | CCTP ASSISTANCE AUX ETUDES D'OUTILS AEROPORTUAIRES ET DE MODELISATIONS DES FLUX DE TRAFIC. | ROBERT PATRICE |
| NT97-902 | DEMARCHE DE VALIDATION EN MILIEU SIMULE | HERMANN ERIC |
| NT97-903 | EOLIA : CR DE LA TROISIEME REUNION TECHNIQUE DU 10/12/97 | MARCHE STEPHANE |
| NT97-904 | COMMENTAIRE SUR LE DOCUMENT OPERATIONS ON CONTINENTAL AIRSPACE WITH ATN BASED COMMUNICATION | TAHMASSEBI SOPHIE |
| NA97-905 | CR DE LA DIVISION SAS DU 17 DECEMBRE 1997 | VALLAURI ERIC |
| NT97-906 | COLLABORATION MCS ENTRE CENA/EEC | ESTEBAN OLIVIER |
| NT97-907 | AUTOMATES DE L'IHM DU PROJET EOLIA | LAPASSET LAURENT |
| NT97-908 | LA DETECTION DE PROBLEMES DS L IOCP PD/3 / EVOLUTIONS APPLIQUEES A ERATO ET BILAN | CAZARD BEATRICE |
| NT97-909 | IMPACT DE L EVOLUTION DES SYSTEMES SUR LES MISSIONS DESSERVICES TECHNIQUES | TROILLARD ELISABETH |
| R97-001 | PD3/PLAN QUALITE INTERNE CENA | CAQUET MICHEL |
| R97-002 | RAPPORT DEA-ETUDES DES RESEAUX DE PETRI STOCHASTIQUES | LEZAUD PASCAL |
| R97-003 | HCI-NATURAL SCIENCE & DESIGN : A FRAMEWORK FOR TRIANGULATION ACCROSS DISCIPLINES (ARTICLE SOUMIS A DES'97 DESIGNING INTERACTIVE SYSTEMS) | MACKAY WENDY,FAYARD LAURE |
| R97-004 | TOPOLOGIE RESEAU | ZERBIB FREDERIC |
| R97-005 | RAPPORT SYNTHESE DES TESTS DE L'ETUDE GAIA | PSYNERGIE MARSEILLE |
| R97-006 | RAPPORT DE SYNTHESE DE L'ETUDE GAIA | PSYNERGIE MARSEILLE |
| R97-007 | BILAN RAPPORT D'ACTIVITES 95/96 | COLIN-DE-VERDIERE DOMINIQUE |
| R97-008 | EVALUATIONS DES PREVISIONS DE TRAJECTOIRE | FAVIA BLANDINE |
| R97-009 | TDP V1.5 : DOSSIER DE CONCEPTION | VILLE GEOFFROY,KELLER PASCAL |
| R97-010 | DOSSIER DE SPECIFICATION VZCT-V2 | DOS DENIS |
| R97-011 | EXPERIMENTATION MAGIC/TNP : RESULTATS DE LA CAMPAGNE D'EVALUATION MENEE AUPRES DE PILOTES ET CONTROLEURS | LOURME REGIS,CHICOT XAVIER |
| R97-012 | RADICALEMENT NOUVEAU ET NEANMOINS FAMILLIER : LES STRIPS PAPIERS REVUS PAR LA REALITE AUGMENTEE-ARTICLE SOUMIS A L'IHM'97 (SEPTEMBRE 1997) | MACKAY WENDY,FAYARD LAURE |
| R97-013 | TESTS ET EVALUATION D'UN OUTIL DE PLANIFICATION MULTI-SECTEURS | CHABRE BERNARD |
| R97-014 | SERVICE D'ACCES AUX RESSOURCES APPLICATIVES HEBERGEES | SAR SOMANOS |
| R97-015 | SPECIFICATION ET CONSTRUCTION INCREMENTABLE DES MODELES DE SURETE DE FONCTIONNEMENT-APPLICATION AU CAUTRA | FOTA NICOLAS |
| R97-016 | SUIVI DE LA MISE EN OEUVRE TCAS II EN FRANCE EN 1996 | VALLAURI ERIC |
| R97-017 | PREMIERE SIMULATION ARITHMETIQUE RELATIVE A LA MISE EN OEUVRE DE LA RVSM EN FRANCE | MAUGIS LIONEL,KERLIRZIN PHILIPPE |
| R97-018 | TDP V1.5 DOSSIER DE SPECICATION | VILLE GEOFFROY |
| R97-020 | RECHERCHE SUR L'OPTIMISATION DES CYCLES ACTIVITES REPOS ET LE MAINTIEN DE LA VIGILANCE DES CONTROLEURS DU TRAFIC AERIEN CIVIL-SYNTHESE | LAA |
| R97-021 | ANALYSE DE L'ECOULEMENT DE TRAFIC PENDANT LA SEMAINE DU SALON DU BOUGET DU 15 AU 22 JUIN 1997 | PRINTEMPS ALAIN |
| R97-022 | BILAN TECHNIQUE DU PROJET CAMELIA | TAHMASSEBI SOPHIE,MARCHE STEPHANE,MUSTIELES ARTHUR,LASSERRE ANNABEL |
| R97-023 | ETUDE ET REALISATION D'UN BUS D'ENTREE/ SORTIE-RAPPORT QTS | RUIZ DOMINIQUE |
| R97-024 | RAPPORT D'ETUDE CENA SUR UNE ETUDE COUT/ AVANTAGES PORTANT SUR LES SYSTEMES CLAIRE ET ISATIS | HOUALLA MARC |
| R97-025 | REPARTITION PAR CATEGORIES DES VOLS ARRIVEE A ORLY EN 1996 | ALLARD ERIC |
| R97-026 | ANALYSE DES ECHANGES ENTRE PILOTES ET CONTROLEURS DANS LES EXPERIMENTATIONS DRUIDES | COURTEIX SYLVIE |